Business Context and Reporting Period
Company: Deep Fission, Inc. (FISN)
Filing Type: Form 10-Q (Unaudited)
Period Ended: June 30, 2026
Business Overview: Deep Fission is a pre-revenue nuclear energy technology company developing the "Gravity Reactor," a small modular reactor (SMR) designed for emplacement in deep boreholes approximately one mile underground. The company is currently in the development stage, participating in the U.S. Department of Energy (DOE) Reactor Pilot Program. It has no commercial revenue and relies on capital raises to fund operations.
Key Financial Metrics
| Metric | Six Months Ended June 30, 2026 | Three Months Ended June 30, 2026 | As of June 30, 2026 |
|---|---|---|---|
| Revenue | $0 | $0 | N/A |
| Net Loss | $(52.4) million | $(31.0) million | N/A |
| Operating Expenses | $53.4 million | $31.6 million | N/A |
| Cash and Cash Equivalents | N/A | N/A | $93.0 million |
| Accumulated Deficit | N/A | N/A | $(119.1) million |
| Net Cash Used in Operating Activities | $(42.5) million | N/A | N/A |
| Net Cash Provided by Financing Activities | $111.8 million | N/A | N/A |
| Shares Outstanding | N/A | N/A | 59,745,938 |
Note: All figures in millions unless otherwise noted. The company reported no revenue for the periods presented.
Material Changes vs. Prior Period
- Significant Increase in Expenses: Operating expenses surged to $53.4 million for the six months ended June 30, 2026, compared to $3.8 million in the same period in 2025. This 1,299% increase was driven by a $15.3 million rise in stock-based compensation, increased headcount, and higher legal/compliance costs associated with the IPO and regulatory engagement.
- Financing Activity: The company completed a significant capital raise in the first half of 2026, including a $80.0 million private placement (February 2026) and an Initial Public Offering (IPO) in June 2026 yielding $34.3 million in net proceeds. This contrasts with minimal financing activity in the prior year period.
- SAFE Note Conversion: Unlike the prior period, which included a loss from the change in fair value of SAFE Notes, all SAFE Notes were converted to common stock in September 2025. Consequently, the current period shows no such non-operating loss.
- Interest Income: Interest income increased to $1.1 million for the six months ended June 30, 2026, primarily due to interest earned on the substantial cash proceeds from recent financing activities.
Outlook, Risks, and Management Commentary
- Going Concern Warning: Management has raised substantial doubt about the company's ability to continue as a going concern for the twelve months following the report date. Despite the recent capital raises, current cash and projected proceeds are insufficient to fund operations through the next year without additional financing.
- Development Milestones: The company is advancing its phased deployment plan. It has completed a data acquisition well and is advancing a near full-scale proof-of-concept well at its Kansas Site. The DOE conditionally approved the Nuclear Safety Design Agreement post-quarter, allowing the company to submit a Preliminary Documented Safety Analysis.
- Capital Requirements: The company estimates it will require substantial additional capital to complete the development, licensing, and commercial deployment of its first reactor. It plans to seek further funding through equity issuances, debt, or strategic partnerships.
- Internal Controls: The company disclosed that its disclosure controls and procedures were not effective as of June 30, 2026, due to material weaknesses in internal control over financial reporting. Remediation efforts are underway, including hiring key personnel and implementing new equity management systems.
- Commitments: The company has entered into non-cancelable commitments for approximately $9.2 million for low-enriched uranium fuel and $4.1 million for borehole casing.
Investor Verification Checklist
- Liquidity Runway: Verify the specific timeline for the next required capital raise given the "substantial doubt" going concern warning.
- Regulatory Progress: Monitor the status of the Preliminary Documented Safety Analysis submission to the DOE and the timeline for NRC commercial licensing applications targeted for 2027.
- Internal Control Remediation: Review future filings for updates on the remediation of material weaknesses in internal controls over financial reporting.
- Capital Dilution: Assess the potential dilution impact of future equity issuances required to fund the high-burn-rate development phase.
- Contractual Obligations: Confirm the status of the $9.2 million uranium fuel commitment and the $4.1 million casing procurement to ensure no defaults or cash flow constraints.