Business Overview: Deep Fission is a pre-revenue nuclear energy technology company developing the "Gravity Reactor," a small modular reactor (SMR) designed for deep subsurface emplacement (approx. one mile underground). The company is currently in the development stage, participating in the U.S. Department of Energy (DOE) Reactor Pilot Program. It has no commercial revenue and relies on equity financing.

Key Financial Metrics

Metric Q1 2026 Q1 2025
Revenue $0 $0
Net Loss $(21,343,447) $(3,136,887)
Operating Expenses $21,838,481 $1,719,012
Cash and Cash Equivalents (End of Period) $84,767,555 $5,946,632
Net Cash Used in Operating Activities $(14,047,760) $(1,627,908)
Net Cash Provided by Financing Activities $75,149,332 $860,800
Accumulated Deficit $(88,070,546) $(8,861,032)
Shares Outstanding (as of May 4, 2026) 56,396,123 N/A

Material Changes vs. Prior Period

  • Significant Increase in Expenses: Total operating expenses surged by 1,170% year-over-year, driven primarily by a $10.4 million increase in non-cash stock-based compensation and higher personnel costs due to expanded headcount.
  • Capital Raise: In February 2026, the company completed a private placement raising $80.0 million (net proceeds approx. $75.1 million) by issuing 5,333,333 shares at $15.00 per share. This contrasts with Q1 2025, which saw minimal financing activity.
  • SAFE Note Conversion: All Simple Agreements for Future Equity (SAFE Notes) were converted into common stock during the September 2025 Merger. Consequently, the Q1 2026 period did not include the significant non-cash losses associated with changes in the fair value of SAFE Notes that impacted Q1 2025.
  • Asset Growth: Cash balances increased by approximately $61 million due to the private placement, offsetting the operating cash burn.

Outlook, Risks, and Management Commentary

  • Going Concern: Management has expressed substantial doubt about the company's ability to continue as a going concern for the next 12 months without additional financing. The company estimates it requires approximately $200 million to complete development and commercial deployment of its first reactor.
  • Development Milestones: The company is focused on Phase 1 of its deployment plan, which includes engineering validation and proof-of-concept wells. It has leased a site in Parsons, Kansas, and drilled a data acquisition well to 6,000 feet. The goal is to demonstrate a commercial-scale borehole and deploy a prototype reactor.
  • Regulatory Path: The company aims to apply for a commercial license with the Nuclear Regulatory Commission (NRC) in the first half of 2027, potentially converting a pilot reactor to commercial operation.
  • Commitments: The company entered into an uncancelable commitment to purchase low-enriched uranium fuel for approximately $9.2 million.
  • Internal Controls: The company disclosed material weaknesses in internal control over financial reporting as of March 31, 2026, though a remediation plan is underway.

Investor Verification Checklist

  • Capital Sufficiency: Verify the timeline and certainty of future fundraising given the stated need for $200 million and the "substantial doubt" going concern warning.
  • Stock-Based Compensation: Review the $10.4 million non-cash expense impact on net loss and the remaining unrecognized stock-based compensation of $75.9 million.
  • Technology Validation: Assess the progress of the Kansas site drilling and the feasibility of the subsurface reactor deployment model.
  • Regulatory Status: Monitor engagement with the DOE and NRC regarding the Reactor Pilot Program and licensing timelines.
  • Internal Controls: Track the remediation of material weaknesses in financial reporting controls.