Tennessee Valley Authority quarterly report, Q2 FY2018

Tennessee Valley Authority — Form 10-Q Summary

Business context and reporting period

TVA is a federally created, self-supporting public power provider serving more than nine million people, alongside river-management and stewardship responsibilities. This unaudited filing covers the fiscal quarter and six months ended March 31, 2018; TVA’s fiscal year ends September 30. Amounts below are in millions of dollars unless stated otherwise.

Financial results and position

MetricThree months ended March 31, 2018Three months ended March 31, 2017Six months ended March 31, 2018Six months ended March 31, 2017
Operating revenue$2,792$2,547$5,341$5,093
Operating income$765$534$1,363$963
Net income$462$211$750$313
Interest expense$314$338$636$677
  • Operating margin was approximately 27.4% for the quarter and 25.5% for the six-month period, versus 21.0% and 18.9%, respectively, a year earlier.
  • Quarterly revenue rose 9.6% and six-month revenue rose 4.9%. Electricity sales volume increased about 9% and 6%, respectively. Base revenue increased, while six-month fuel-cost recovery revenue declined.
  • Six-month operating cash flow was $1,842, compared with $1,516 in 2017. Investing cash outflow was $1,141, versus $1,302; financing provided $192, compared with $214 used in the prior-year period. Cash and cash equivalents ended March at $1,193, up from $300 at September 30, 2017.
  • At March 31, total assets were $50,507 and total liabilities were $40,575. Total debt outstanding was $25,546, including $4,112 of current debt. Cash was $1,193; current liabilities of $6,475 exceeded current assets of $4,143.
  • TVA had $1,729 available under its $2.65 billion revolving credit facilities, with $921 of letters of credit outstanding and no cash borrowings. A separate $150 million U.S. Treasury facility was undrawn.
  • Capital and nuclear-fuel expenditures were $1,135 for the six months. TVA issued $998 of power bonds and redeemed $700 of power bonds in the period.

Changes versus the prior comparable period

  • Net income increased 119% for the quarter and 140% for the six months. The filing attributes the improvement principally to higher electricity sales from colder January weather and the base-rate adjustment effective October 1, 2017.
  • TVA recorded a 24-hour energy-demand record in January and three of its top-12 winter peak-demand records. The base-rate adjustment was expected to contribute about $195 million to fiscal 2018 revenue.
  • For six months, fuel expense fell $101 million, primarily due to lower effective fuel rates and a generation mix with more hydroelectric and natural gas power. Operating and maintenance expense fell $34 million, mainly due to fewer nuclear outage days and operating efficiencies.
  • Coal-fired generation’s share of six-month power supply decreased from 25% to 19%; natural gas/oil-fired generation rose from 15% to 18%, and hydroelectric generation from 6% to 9%.

Outlook, risks, contingencies and unusual items

  • TVA states it believes it can fund ongoing operations and planned capital investments over the next decade through a mix of debt, power revenues, rate increases, cost reductions, or other financing. No specific earnings guidance is provided.
  • The elevated March cash balance was partly related to short-term borrowing in March to fund a long-term bond maturity due April 1; TVA said cash returned to normal target levels in April. Debt capacity is limited by the statutory $30 billion cap on bonds, notes, and other indebtedness.
  • The Gallatin coal-combustion-residuals litigation is a major uncertainty. TVA recorded related liabilities of $897 million ($871 million long-term and $26 million current) based on an estimated on-site project cost of about $900 million. If on-site permits cannot be obtained and removal must occur off-site, TVA estimates costs could reach $2.0 billion and take about 40 years. Additional penalties or orders in a separate state case were not reasonably estimable.
  • TVA estimated environmental expenditures of $1.2 billion for its CCR conversion program through 2022, $165 million for clean-air projects from 2018–2022, and $500 million for Clean Water Act requirements from 2018–2024. These estimates exclude new Gallatin litigation-related requirements.
  • Other project exposures include estimated additional spending of $334 million for Boone Dam remediation, $84 million for Pickwick embankment work, and $28 million for remaining nuclear flood-preparedness modifications. Costs and schedules may change.
  • TVA reported $18 million accrued for legal proceedings and approximately $10 million for certain environmental cleanup sites. It also disclosed nuclear insurance arrangements that may require retrospective premiums, and asset-retirement obligations totaling $4,389 million.
  • Operational and regulatory risks include evolving environmental rules, CCR groundwater investigations, potential additional costs at Allen, nuclear safety and supplier performance, weather, fuel and purchased-power prices, cyber and physical security, and flat long-term electricity demand. TVA’s financial trading program remained suspended.
  • The President’s FY2019 budget proposed selling TVA transmission assets; the filing describes this as a proposal, not an enacted transaction. TVA reported no material change in market-risk disclosures, no off-balance-sheet arrangements, and effective disclosure controls.

Important facts for investors to verify

  • Whether the Gallatin appeal, permitting decisions, or regulatory developments change the recorded $897 million liability or the potential $2.0 billion off-site exposure.
  • Whether TVA achieves forecast revenue and cash generation after the weather-driven sales increase and the fiscal 2018 rate adjustment.
  • Near-term refinancing needs, debt-limit headroom, revolving-credit availability, and cash levels after the April bond maturity.
  • Actual timing and costs of the CCR conversion program and other environmental, dam-safety, and nuclear projects relative to estimates.
  • Whether flat demand, distributed generation, changing customer preferences, and future regulation affect TVA’s resource plan, rates, and long-term capital requirements.