5E Advanced Materials, Inc. annual report, FY2022

5E Advanced Materials, Inc. — Form 10-K Summary

Reporting period: Fiscal year ended June 30, 2023, compared with fiscal 2022. Although the request metadata refers to 2021 Q4, the supplied filing is the company’s FY2023 Form 10-K.

Business context

5E is an exploration-stage company developing the Fort Cady boron and lithium project in California. It has not generated revenue from mineral production and has no known proven or probable mineral reserves. Its strategy is to commission a small-scale facility (SSF), use operating data to advance a phased larger complex, and pursue boric acid, lithium carbonate, gypsum, and potentially downstream boron materials.

Financial results and liquidity

MetricFY2023FY2022
RevenueNoneNone
Operating expenses$36.7 million$67.8 million
Operating loss$36.7 million$67.8 million
Net loss$30.6 million$66.7 million
Loss per share, basic and diluted$0.70$1.63
Cash used in operating activities$30.7 million$28.6 million
Cash used in investing activities$39.3 million$11.4 million
Cash provided by financing activities$59.3 million$30.6 million
Cash and cash equivalents at year-end$20.3 million$31.1 million
Working capital at year-end$13.3 million$25.2 million

There is no operating revenue, so operating margins are not meaningful. The lower net loss chiefly reflects reduced general and administrative expense, including much lower share-based compensation and prior-year listing-related costs. FY2023 also included an $11.7 million noncash gain on the convertible-note derivative and $6.9 million net interest expense. The company recorded no income-tax benefit.

At June 30, 2023, total liabilities were $47.3 million and stockholders’ equity was $53.6 million. The $60 million senior secured convertible note was recorded at $61.7 million before unamortized discounts and issuance costs; long-term debt, net, was $37.7 million. The note bears 4.5% annual interest if paid in cash or 6.0% if paid in additional notes, matures in August 2027, is convertible at $17.60 per share, and is secured by substantially all assets. It includes a $10 million minimum-cash covenant.

The auditor and management disclosed substantial doubt about the company’s ability to continue as a going concern. Management expects available liquidity to fall below the note’s $10 million covenant threshold in the latter part of calendar 2023 under its modified plan. A breach not cured within 30 days could make the approximately $61.7 million note balance immediately due. The company says additional financing is necessary; it has no committed external funding source.

Material changes versus FY2022

  • Operating expenses fell 46% to $36.7 million. General and administrative expense declined by $29.3 million, including a $26.7 million reduction in share-based compensation and lower listing-related professional fees; higher staffing and benefits partly offset the decline.
  • Project expenses decreased $2.9 million, partly offset by plug-and-abandonment, EPA-compliance, and construction-insurance costs.
  • Investing cash outflow increased to $39.3 million as SSF construction accelerated; construction in progress rose to $67.6 million from $25.6 million.
  • Cash declined by $10.7 million. The August 2022 $60 million convertible-note financing and option exercises funded operations and construction.
  • The company changed its development focus from boron and sulphate of potash to boron and lithium, and adopted a phased large-complex plan. It also let an Elementis mineral lease expire, recording $0.9 million of impairment.
  • The company appointed Susan Brennan as CEO effective April 24, 2023, succeeding Anthony Hall.

Project outlook, risks and contingencies

  • SSF and permitting: Construction was substantially complete and commissioning had progressed, but initial boric-acid production remained contingent on final EPA authorization and successful commissioning. EPA comments on well-related reports were answered in June 2023; water-injection testing and subsequent acid-injection authorization remained steps before mining could start. The filing does not provide a confirmed production start date.
  • Large-scale plan: The May 2023 updated assessment targets Phase 1 production of 90,000 short tons of boric acid and 1,100 short tons of lithium carbonate per year, with a target go-live in Q2 2026. Phases 2 and 3 each target incremental annual capacity of 180,000 short tons of boric acid and 2,200 short tons of lithium carbonate, targeted for Q4 2028 and Q2 2031. Full-operation targets are 450,000 and 5,500 short tons per year, respectively. These are targets, not assured outcomes.
  • Capital needs: Phase 1 initial capital is estimated at $288 million before contingency and owner’s costs, or $373 million including those amounts and a 25% contingency. Estimates may change with engineering, inflation, construction costs, and SSF operating data. The company states it needs additional capital for planned development and operations.
  • Resources: The updated assessment estimates 74.31 million short tons of measured and indicated resources and 96.90 million short tons of inferred resources at a 2% B₂O₃ cutoff. It reports 5.80 million short tons of boric-acid equivalent and 141,000 short tons of lithium carbonate equivalent in measured and indicated resources, plus 8.17 million and 166,000 short tons, respectively, in inferred resources. Resources are not reserves and do not demonstrate economic viability.
  • Customers and markets: There are no binding supply or offtake agreements. Letters of intent with prospective counterparties are non-binding. Commercial success depends on permitting, technical performance, financing, customer qualification, commodity prices, and competing with established producers.
  • Risks and infrastructure: The company depends on one project and faces risks from water availability, power and natural-gas infrastructure, supply-chain delays, labor and input-cost inflation, environmental compliance, permitting, and commodity-price volatility. Lithium recovery has not been field-tested at the project.
  • Litigation: 5E sued Matrix Services in July 2023 over the SSF construction contract. Matrix counterclaimed in August 2023 and seeks approximately $5.5 million. The case was in early stages; the company could not estimate reasonably possible losses.
  • Other items: The company reported that its disclosure controls and internal control over financial reporting were effective at year-end and that a previously reported material weakness had been remediated. The auditor did not attest to internal-control effectiveness.

Most important facts for investors to verify

  • Current cash, monthly cash burn, financing availability, and the timing of any potential breach of the $10 million note covenant.
  • EPA authorization status, completion of SSF commissioning, and independently verifiable operating and recovery data.
  • Updated project capital requirements, feasibility-study progress, schedule, and funding plan for Phase 1.
  • Whether any non-binding customer discussions become binding offtake agreements and on what volumes, prices, and conditions.
  • Technical and economic assumptions underpinning the resource estimate, including the distinction between resources and reserves.
  • Status and potential financial impact of the Matrix dispute, and any material changes to note terms, dilution, or security interests.