TechPrecision Corporation — FY2014 Form 10-K
Reporting period: Fiscal year ended March 31, 2014, with fiscal 2013 comparisons. The filing also reports the quarter ended March 31, 2014; it is not a standalone calendar-year 2013 fourth-quarter report. TechPrecision manufactures large precision-fabricated and machined metal components through U.S. subsidiary Ranor and China subsidiary WCMC.
Financial results and liquidity
| Metric | FY2014 | FY2013 |
|---|---|---|
| Net sales | $21.1 million | $32.5 million |
| Gross profit (loss) | $(0.7) million; (3.5)% margin | $6.6 million; 20.2% margin |
| Operating loss | $(6.8) million | $(1.6) million |
| Net loss | $(7.1) million; $(0.34) per share | $(2.4) million; $(0.13) per share |
| Cash from operations | $0.2 million | $1.8 million |
| Capital expenditures | $0.1 million | $0.7 million |
Revenue fell 35%, led by lower precision-industrial sales, reduced Chinese subsidiary activity, and delayed customer orders. Cost of sales exceeded revenue in FY2014. Management cited approximately $3.2 million of under-absorbed overhead and significant contract losses, including a $1.9 million loss on first-article/prototype work and a $2.7 million provision tied to a customer’s request to reduce or delay units. The filing cites total contract-loss impacts of approximately $4.6 million in one discussion and $4.9 million in another.
At March 31, 2014, cash was $1.09 million, working capital was negative $2.0 million (versus positive $3.1 million a year earlier), and total debt was approximately $4.21 million. Total liabilities were approximately $13.44 million. The filing reports operating cash generation despite the net loss, supported in part by customer advances and collections; cash declined by $1.99 million during the year. Net sales backlog was $22.9 million at year-end, expected to be delivered over the following two fiscal years; $3.5 million was subject to possible cancellation following a contract-modification dispute. Backlog was $18.0 million at May 31, 2014.
Fourth quarter: Net sales were $3.61 million, gross loss was $2.65 million, and net loss was $4.10 million, including the $2.7 million estimated contract-loss provision.
Changes, outlook, and material risks
- FY2014 sales to WCMC fell to $0.2 million from $3.3 million, after a major customer shifted furnace production back to the U.S. and delayed orders. Precision-industrial revenue also declined sharply; Navy/Maritime sales were roughly flat and nuclear revenue increased.
- Management said substantial doubt existed about the company’s ability to continue as a going concern. Santander covenant defaults remained unwaived at March 31, 2014; the related debt was classified as current, and the bank could demand repayment. The revolving credit facility had expired and was not renewed.
- After year-end, Utica Leasco agreed to lend Ranor $4.15 million, secured by specified machinery and equipment and guaranteed by TechPrecision. The company said about $2.65 million was used to repay Santander debt, about $0.24 million for fees and costs, and about $1.27 million retained for general purposes. Santander granted further forbearance through July 31, 2014. These arrangements did not eliminate the company’s financing and going-concern risks.
- Management’s plan required additional long-term financing, increased backlog, a shift toward repeat unit-delivery work rather than custom prototypes, and lower operating costs. Management anticipated positive cash flow in FY2015 if these measures succeeded; this was conditional, not a guarantee.
- Customer concentration remains significant: the six largest customers generated more than 65% of FY2014 revenue, and the largest accounted for 19%. A May 2014 arbitration demand against GTAT followed its request to reduce units under contract; the company sought damages but could not predict the outcome.
- Management identified a material weakness in financial-reporting controls due to insufficient accounting staffing and untimely reconciliations and review. A late adjustment corrected a project-cost date error affecting work in process and cost of sales. Remediation steps included hiring a Ranor controller and formalizing reconciliations and contract reviews; management had not concluded the weakness was remediated.
- Other key risks include dependence on customer purchase orders, contract estimates and delivery schedules, volatile or long-lead raw materials, production underutilization, competition, China-related operating and currency risks, and the possibility of financing-related dilution. The company reported no material environmental-compliance expenditures and no R&D spending in FY2014 or FY2013.
Most important facts to verify
- Whether the company obtained durable financing after the disclosed Utica loan and short-term Santander forbearances, and whether covenant defaults or acceleration rights were resolved.
- Whether FY2015 operating cash flow improved and costs were reduced as management planned.
- Whether the $22.9 million backlog converted to revenue, particularly the $3.5 million subject to possible cancellation and the disputed GTAT contract.
- Whether contract-loss estimates and the related arbitration recovery were revised or resolved; the filing gives differing approximate aggregate loss figures.
- Whether the material weakness was remediated and subsequent filings were timely and reliable.
- Whether customer concentration, cash availability, and share dilution changed after the reported period. Common shares outstanding were 23.95 million at March 31, 2014 and 24.67 million as of July 7, 2014.