HARMONY GOLD MINING CO LTD annual report, Q4 FY2023

Business context and reporting period

Harmony Gold Mining Company Limited filed this annual report on Form 20-F on October 31, 2023, covering the fiscal year ended June 30, 2023. Although the request identifies “2022 Q4,” the filing is for FY2023, not a standalone quarter. The South African-based gold producer reports under IFRS in South African rand (R); it also operates in Papua New Guinea (PNG) and Australia.

Financial and operating performance

MetricFY2023FY2022Change / context
RevenueR49.275bnR42.645bnUp R6.630bn, mainly from a higher realized gold price
Gold sold45,690 kg46,153 kgDown about 1%
Gold produced45,651 kg46,236 kgDown about 1.3%
Average realized gold priceR1,032,646/kgR894,218/kgUp 15.5%, including hedging effects
Cost of salesR39.535bnR41.927bnLower mainly because FY2022 included R4.433bn of impairment charges
Cash costs (non-GAAP)R735,634/kgR701,024/kgUp 4.9%; production costs increased 5.3% to R34.866bn
All-in sustaining costs (non-GAAP)R889,766/kgR835,891/kgUp 6.4%
Operating cash flowR9.948bnR6.924bnHigher, principally due to revenue growth
Investing cash flow(R10.596bn)(R6.200bn)Includes Eva Copper acquisition and higher property, plant and equipment additions
Financing cash flowR1.194bn(R1.151bn)Borrowings raised exceeded repayments
Total cash flowR419m(R371m)As reported, including foreign exchange differences
ImpairmentsNilR4.433bnNo FY2023 impairment charge
Finance costsR994mR718mHigher debt balances and interest rates

The supplied filing text does not provide a clear FY2023 net profit or operating margin value. Cash costs and all-in sustaining costs are non-GAAP measures and should not be treated as substitutes for IFRS results.

Debt, liquidity and capital spending

At June 30, 2023, non-current borrowings were R5.592bn, comprising US$100m drawn under the term facility and US$200m under the revolving facility. The R2.5bn rand revolving facility and R1.5bn green term loan were undrawn. The filing reports leverage of 0.2 times and interest cover of 26 times, with no covenant breaches. Current borrowings were accrued interest of R103m, repaid July 3, 2023. Management said operating cash, cash on hand and committed undrawn facilities should meet near-term needs; the filing text does not provide a clear cash balance or net-debt figure.

FY2023 capital expenditure was approximately R7.6bn, funded from operating cash. The FY2024 operational capital budget is R9.530bn, excluding renewable-project capital, with financing expected from operations and borrowings as needed. Eva Copper was acquired in December 2022 for US$180m cash consideration; the filing reports R2.996bn of acquisition-related investing outflow. The company states that Wafi-Golpu and Eva Copper will require additional capital over coming years, with some expected to be debt-funded.

Material changes versus the prior comparable period

  • Revenue rose despite slightly lower gold sales, as the realized gold price increased and the rand weakened against the US dollar.
  • Operating cash flow increased by R3.024bn. Cash costs and all-in sustaining costs per unit rose amid wage, electricity, reagent and other input-cost inflation.
  • FY2022 impairment charges did not recur; FY2023 recorded no impairment.
  • Eva Copper acquisition and increased project and operating investment drove higher investing outflows and borrowing drawdowns.
  • Production performance varied: Mponeng and Doornkop improved, while Target 1 and Kusasalethu experienced significant operational challenges. Tshepong was separated into North and South operations, and Bambanani closed in June 2022.
  • Attributable gold and gold-equivalent reserves were reported at 39.3 million ounces, down from 39.8 million ounces, reflecting depletion and other losses partly offset by additions.

Outlook, management commentary and key risks

Management budgeted R9.530bn of FY2024 operational capital expenditure and expects continued cost increases from inflation, labor, electricity and consumables. South African Eskom load constraints persisted, although the filing says curtailment did not cause material production losses in FY2023. A 30MW solar project was commissioned in May 2023; a further 137MW phase was in procurement and expected to be completed in FY2025. The company also describes later planned solar and wind phases.

Key exposures include gold-price and currency volatility; power reliability and tariff increases; shortages and higher costs of steel, reagents and other inputs; underground safety, seismicity and flooding; labor and community disruption; reserve-estimation uncertainty; environmental rehabilitation and water obligations; evolving South African and PNG mining laws; and project execution, permitting and financing risks. Wafi-Golpu remains undeveloped and faces judicial reviews concerning its permitted deep-sea tailings placement. Eva Copper remained in feasibility and exploration work, with no mining underway and reserves not declared; a study update was expected in 2024. Carbon-tax costs could rise materially after 2025; management estimates R500m–R800m of annual impact by FY2030 from electricity use, subject to legislation and assumptions.

The filing contains a material apparent inconsistency in silicosis/TB settlement disclosures: the legal-proceedings section reports a R549m provision at June 30, 2023, while another passage states R820m for that date. The legal-proceedings roll-forward identifies R820m as the June 30, 2022 balance and R549m as the FY2023 balance. Verify the audited note and confirm the correct amount.

Most important facts for investors to verify

  • Confirm the filing period: this is FY2023 ended June 30, 2023, not “2022 Q4.”
  • Review the audited financial statements for net income, margins, cash balances, net debt and any metrics not clear in the supplied filing text.
  • Reconcile the silicosis/TB provision discrepancy and the reported cash-flow and capital-expenditure figures against the audited notes.
  • Assess FY2024 capital funding and project financing needs, especially for Eva Copper and Wafi-Golpu, alongside gold-price and foreign-exchange sensitivity.
  • Track production recovery at Target 1 and Kusasalethu, reserve replacement, power supply, and the outcome of Wafi-Golpu permitting and legal proceedings.