International Seaways, Inc. current report, 12 November 2021

Business Context and Reporting Period

This Form 8-K filing by International Seaways, Inc. (INSW) reports material events occurring on November 12, 2021, and November 15, 2021. The report details the dissolution of a joint venture, the restructuring of associated debt, and the initiation of new financing arrangements for future vessel deliveries.

Key Financial Metrics and Transactions

  • Debt Repayment: The Company repaid approximately $22 million of the outstanding balance on the NT Suez Facility, a $66 million senior secured term loan.
  • New Debt Facility: Entered into a $25 million term loan facility with ING Bank N.V. on November 12, 2021. The full amount was drawn down immediately.
  • Loan Terms: Interest is based on LIBOR plus 2%. The loan amortizes quarterly starting February 2022 and matures in November 2026.
  • Future Financing: Entered into sale and leaseback agreements with Bank of Communications Limited (BoComm) affiliates expected to provide approximately $245 million in aggregate funding for three dual-fuel LNG VLCC newbuilds.
  • Liquidity and Covenants: The new Credit Agreement requires maintaining minimum liquidity, a maximum consolidated leverage ratio, and ensuring current assets exceed current liabilities.

Material Changes Versus Prior Period

The primary material change is the termination of the NT Suez Holdco LLC joint venture, previously owned 51% by INSW and 49% by WLR/TRF. Following dissolution, INSW now owns 100% of the entity controlling the Loire tanker, while WLR/TRF owns the entity controlling the Namsen tanker. This structural change necessitated the repayment of the joint venture's shared debt and the establishment of a new, vessel-specific credit facility for INSW's retained asset.

Outlook, Risks, and Management Commentary

  • Asset Strategy: The Company is advancing its fleet expansion with three dual-fuel LNG VLCC newbuilds scheduled for delivery in Q1 2023.
  • Financing Structure: The new BoComm transactions utilize a sale and leaseback structure with seven-year bareboat charter-in leases and purchase options.
  • Risk Factors: The new Credit Agreement includes covenants requiring the fair market value of the Loire to remain at least 135% of the outstanding loan principal. Failure to meet financial covenants could trigger acceleration of the debt.
  • Use of Proceeds: Proceeds from the new $25 million loan were used to repay the prior joint venture debt, with any remaining funds allocated to general corporate purposes.

Investor Verification Checklist

  • Verify the current fair market value of the Loire tanker to ensure compliance with the 135% loan-to-value covenant.
  • Confirm the construction timeline for the three dual-fuel LNG VLCCs to ensure Q1 2023 delivery targets are met.
  • Review the Company's consolidated leverage ratio and liquidity position to assess compliance with the new Credit Agreement covenants.
  • Monitor the status of the BoComm funding commencement, which is tied to the start of construction in late November 2021.