North American Construction Group Ltd. current report, Q3 FY2020

North American Construction Group Ltd. - Q3 2020 Filing Summary

Business Context and Reporting Period

This Form 6-K filing covers the interim period ended September 30, 2020. North American Construction Group Ltd. (NACG) provides mining and heavy construction services, primarily in the Canadian oil sands, with a significant ownership stake in Nuna Logistics (Nuna), which expands operations into base metals, precious metals, and diamonds. The quarter was characterized by severe operational headwinds due to COVID-19 site access restrictions and above-average rainfall, though activity levels showed sequential recovery from Q2.

Key Financial Metrics (Three Months Ended Sept 30, 2020)

Metric Q3 2020 Q3 2019 Change
Revenue $94.0 million $166.3 million -43.5%
Gross Profit $15.4 million $18.3 million -15.9%
Gross Profit Margin 16.3% 11.0% +5.3 pts
Operating Income $9.9 million $10.3 million -3.9%
Adjusted EBITDA $37.1 million $37.2 million -0.3%
Net Income $6.8 million $7.6 million -9.7%
Free Cash Flow ($17.0 million) ($25.3 million) Improvement
Adjusted EPS $0.26 $0.41 -36.6%

Liquidity and Debt: As of September 30, 2020, total liquidity was $99.4 million (cash of $40.3 million plus $59.1 million unused credit facility). Total debt stood at $462.1 million, with net debt at $421.8 million. The company maintains a Senior Leverage Ratio of 2.29:1, well within its 3.0:1 covenant limit.

Material Changes vs. Prior Period

  • Revenue Decline: The 43.5% year-over-year revenue drop was driven by COVID-19 restrictions, wet weather causing equipment idle time, and a change in accounting treatment for Nuna (now equity method rather than proportionate consolidation).
  • Sequential Recovery: Revenue increased 33% from Q2 2020 to Q3 2020, indicating a gradual return to pre-pandemic activity levels. September operating hours were roughly double those of May.
  • Margin Expansion: Despite lower revenue, gross profit margin improved to 16.3% from 11.0% in Q3 2019, aided by strict cost controls and the Canada Emergency Wage Subsidy (CEWS), which provided $11.0 million in subsidies for the quarter.
  • Capital Structure: The company redeemed its 5.50% convertible debentures in April 2020 via share issuance, reducing interest expense. Subsequent to period-end, the credit facility was expanded to $325 million.

Outlook, Guidance, and Risks

  • 2021 Outlook: Management expects mid-point EBITDA and Free Cash Flow (FCF) for 2021 to be approximately 15% and 45% higher, respectively, than anticipated full-year 2020 numbers.
  • 2020 FCF Projection: Projected full-year 2020 FCF is in the range of $40 million to $55 million, with a significant portion expected to be generated in Q4.
  • Capital Allocation: Priorities for 2021 include debt reduction and share buybacks. No shares were purchased in Q3 due to cash usage for winter preparations and a hedge related to the convertible debenture redemption.
  • Strategic Wins: A major $250+ million gold mine construction contract was awarded in October 2020 to a joint venture with Nuna, supporting the goal of 40% non-oil sands EBIT by 2022.
  • Risks: Key risks include the duration and severity of the COVID-19 pandemic, volatility in oil prices, and weather conditions affecting operational volumes. The company notes that long-term contracts allow customers to unilaterally reduce scope.

Investor Verification Checklist

  • Weather Impact: Verify the extent of rainfall impact on Q3 volumes and the expected recovery in Q4 winter operations.
  • Accounting Changes: Confirm the impact of the shift from proportionate consolidation to the equity method for Nuna on future revenue recognition.
  • Debt Covenants: Monitor compliance with the Senior Leverage Ratio (2.29:1) and Fixed Charge Coverage Ratio (1.28:1) as liquidity fluctuates.
  • Wage Subsidy Reliance: Assess the sustainability of profitability without the Canada Emergency Wage Subsidy (CEWS) as the program evolves.
  • Backlog Execution: Track the execution of the $87.9 million backlog expected to be performed in Q4 2020 and the new $250 million gold mine contract.