Eco Wave Power Global AB (Publ) current report, Q2 FY2025

Business Context and Reporting Period

This Form 6-K filing by Eco Wave Power Global AB (Publ) covers the month of June 2025, specifically dated June 25, 2025. The report serves to disseminate a press release regarding a strategic partnership with AltaSea to launch the first-ever U.S. wave energy project at the Port of Los Angeles.

Financial Metrics

The filing text does not provide a clear value for revenue, profit, cash flow, margins, debt, or liquidity. This document is a current report of a corporate event and does not contain financial statements or performance metrics.

Material Changes

The primary material change reported is the alignment with AltaSea on an official launch date for a wave energy project in the United States. This represents a significant operational milestone for the Company's expansion into the U.S. market.

Guidance, Outlook, and Risks

The filing incorporates by reference the "Forward-Looking Statements" section from the attached press release (Exhibit 99.1). While the specific text of these statements is not included in the body of this Form 6-K, the document indicates that the Company is providing forward-looking information regarding the project launch. No specific risks or contingencies are detailed in the provided text beyond the standard incorporation of the press release's forward-looking statements.

Key Investor Verification Points

  • Verify the specific official launch date for the Port of Los Angeles project as detailed in Exhibit 99.1.
  • Review the terms of the partnership agreement between Eco Wave Power and AltaSea.
  • Examine the "Forward-Looking Statements" in the press release for specific risks associated with the project timeline and execution.
  • Confirm the regulatory status and permitting requirements for the Port of Los Angeles site.