First Solar makes CdTe solar modules and develops, constructs, sells, and services utility-scale solar systems. It reports Components and Systems segments. In June 2016, management ended crystalline-silicon module production and shifted resources toward next-generation CdTe modules and utility-scale systems.

Financial performance

MetricQ3 2016Q3 2015Nine months 2016Nine months 2015
Net sales$688.0m$1,271.2m$2,470.9m$2,636.7m
Gross profit / margin$186.3m / 27.1%$484.4m / 38.1%$640.4m / 25.9%$687.8m / 26.1%
Operating income / margin$88.7m / 12.9%$397.8m / 31.3%$262.8m / 10.6%$384.8m / 14.6%
Net income$154.1m$349.3m$338.1m$382.3m
Diluted EPS$1.49$3.41$3.28$3.75
Operating cash flowNot presented separately by quarter$(100.6)m$(414.0)m

Q3 sales fell 46%, chiefly because of lower systems-project revenue as several projects reached substantial completion and construction activity shifted. Third-party module revenue rose 250% to $213.0m, while systems revenue declined 61% to $475.0m. Nine-month sales declined 6%. Q3 gross margin contracted 11.0 percentage points; nine-month gross margin was nearly flat year over year. Management cited project mix and the favorable $80.0m recycling-liability adjustment recorded in 2015 as factors in comparisons.

Cash, debt, and liquidity

  • Cash, cash equivalents, and marketable securities were $2.09bn at September 30, 2016, versus $1.83bn at December 31, 2015. Restricted cash and investments were an additional $409.6m, including funds dedicated to module collection and recycling.
  • Total debt carrying value was $787.2m, including $626.0m classified as current. This included $550.0m drawn on the revolving facility; management expected to repay those borrowings within 12 months. After $128.6m of letters of credit, revolving-facility availability was $21.4m. The company reported compliance with debt covenants.
  • Nine-month investing cash flow was $(119.6)m and financing cash flow was $500.8m, primarily reflecting the revolver borrowing. Cash increased $287.4m during the period.
  • Management said available liquidity, expected operating cash flows, and financing access should cover working capital, project investment, and capital expenditures for at least 12 months. The company reported $1.2bn of net capital investment in project development and construction.

Changes, outlook, and key commentary

  • Restructuring and impairment charges were $89.8m for the first nine months, mainly related to ending crystalline-silicon production: manufacturing equipment, technology intangibles, and goodwill impairments. Management expected up to $5.0m of additional related charges during the remainder of 2016.
  • Q3 included a $50.5m income-tax benefit, including a $35.4m benefit from reversing an uncertain tax position after confirmation of foreign tax residency. The nine-month tax benefit was $7.7m. These items materially affect reported earnings and tax-rate comparisons.
  • Nine-month other income included $37.8m of gains from restricted-investment sales, a customer matter resolution, and reversal of TetraSun contingent consideration. The filing does not provide a clear standalone amount for the customer matter resolution.
  • Production was 0.8 GW in Q3, with 97% capacity utilization and 16.5% average module conversion efficiency. Management expected approximately 3.1 GW of module production for 2016 and $50m–$100m of capital expenditures in the remainder of 2016.
  • The advanced-stage systems pipeline was approximately 3.1 GW as of November 2, 2016. Management expected a substantial portion of sales, operating income, and cash flow through 2019 from large projects, while warning that construction or sale delays could adversely affect project value and revenue.
  • Management described intense industry competition, oversupply, and falling module and system prices, which could pressure margins. It also noted risks from project timing, financing availability, foreign exchange, project-buyer demand, and potential impairment of manufacturing assets as technology plans evolve.
  • Contingencies include securities class and opt-out lawsuits for which the company could not estimate potential loss, derivative litigation, and a Department of Labor wage-classification proceeding that could involve back wages or federal-government debarment. Product warranty and recycling liabilities were $254.9m and $169.7m, respectively; management disclosed sensitivity of the recycling liability to inflation assumptions.

Most important facts for investors to verify

  • Whether project construction, completion, and sales progress as planned, especially for projects expected to contribute through 2019, and whether revenue recognition timing shifts materially.
  • Whether the $550m revolver borrowing is repaid as expected, and how project spending, operating cash flow, and the limited remaining revolver availability affect liquidity.
  • Whether declining industry prices and project mix continue to pressure gross margins, and whether module cost and efficiency improvements offset that pressure.
  • Whether the crystalline-silicon exit requires further charges or impairments, including any effects on stored manufacturing assets and remaining inventory.
  • Whether the tax benefit, investment gains, customer resolution, and contingent-consideration reversal distort comparisons with recurring earnings.