Tenaya Therapeutics, Inc. quarterly report, Q2 FY2021

Business context and reporting period

Tenaya Therapeutics, Inc. filed this unaudited Form 10-Q for the quarter and six months ended June 30, 2021. The preclinical-stage biotechnology company is developing heart-disease therapies across gene therapy, cellular regeneration and precision medicine. It had no approved products and generated no revenue.

Financial results and liquidity

MetricQ2 2021Q2 2020Six months 2021Six months 2020
Revenue$0$0$0$0
Research and development expense$10.9m$7.0m$20.5m$14.3m
General and administrative expense$4.3m$1.9m$7.8m$3.9m
Total operating expenses$15.2m$8.9m$28.3m$18.1m
Net loss$15.2m$8.7m$28.3m$17.8m
Basic and diluted loss per share$13.26$9.21$25.21$19.32

Margins are not meaningful because the company had no revenue. For the six months, operating cash use was $27.8m; investing cash use was $7.6m, primarily for property and equipment; financing provided $18.7m, including $20.0m net proceeds from Series C preferred stock, partly offset by deferred IPO costs. Cash, cash equivalents and restricted cash ended the period at $112.4m, including $111.9m of cash and cash equivalents.

At June 30, 2021, total assets were $156.9m, current assets $113.2m, current liabilities $9.8m and total liabilities $24.7m. The company reported no debt borrowings; operating lease liabilities totaled $16.5m. Accumulated deficit was $111.1m.

Material changes versus prior comparable periods

  • Q2 net loss increased $6.5m, or 74%, year over year; six-month net loss increased $10.5m, or 59%.
  • Q2 R&D expense rose 57%, primarily from higher facility and laboratory costs, personnel costs and external research costs. Six-month R&D expense rose 44%.
  • Q2 G&A expense rose 126%; six-month G&A expense rose 102%, reflecting increased professional services, staffing and facilities, including costs associated with preparing to become a public company.
  • Property and equipment, net, increased to $24.9m from $17.2m at year-end 2020, alongside manufacturing and office build-out. The company adopted lease accounting guidance in January 2021.

Outlook, risks and unusual items

  • Management expected losses and spending to increase as programs advance, manufacturing capabilities are built and public-company costs rise. It believed June cash plus IPO proceeds would fund operations for at least 12 months from the filing date; this estimate depends on assumptions and spending could exceed expectations.
  • After quarter-end, the August 3, 2021 IPO issued 13.8m shares at $15.00 per share and raised approximately $188.8m net. Preferred shares converted into 26.1m common shares. These transactions are subsequent events and are not reflected in June 30 balances.
  • The company planned to submit an IND or CTA for TN-201, its lead gene-therapy candidate for genetic hypertrophic cardiomyopathy, in 2022, and planned a 2022 IND for TYA-11631, an HDAC6 inhibitor. All programs remained preclinical; timelines and outcomes were uncertain.
  • Management reported modest COVID-19-related research delays, mainly from supplier lead times and temporary academic-institution shutdowns; it cautioned that further disruption could affect research, manufacturing and financing.
  • Key risks include early-stage development and no clinical trials initiated, uncertain safety and efficacy, regulatory and manufacturing challenges, dependence on third parties, intellectual-property disputes, competition and the need for substantial future funding. TN-201 has orphan-drug designation, but this does not assure approval or exclusivity.
  • The filing reported effective disclosure controls and no material change in internal control over financial reporting during the quarter. No material litigation was reported.

Important facts for investors to verify

  1. Confirm the reported cash runway assumptions and how the IPO proceeds are being deployed against the company’s expanding R&D and manufacturing plans.
  2. Track execution and regulatory progress toward the planned 2022 filings for TN-201 and TYA-11631, including any changes to development timelines.
  3. Monitor construction, qualification and operational readiness of the planned cGMP manufacturing facility, as well as reliance on external suppliers and manufacturers.
  4. Review future filings for cash burn, operating-lease commitments, financing needs and any new debt or collaboration terms.
  5. Assess dilution and ownership changes following the IPO, preferred-stock conversion, equity-plan authorizations and eventual release of share lockups.