Business Context and Reporting Period
This Form 6-K filing by Gold Fields Limited covers the month of March 2008, specifically dated March 7, 2008. The company is a major unhedged gold producer with operations in South Africa, Ghana, and Australia, and a developing mine in Peru. The filing primarily addresses a critical operational update regarding power supply allocations in South Africa.
Key Financial and Operational Metrics
The filing does not provide specific financial figures such as revenue, profit, cash flow, margins, debt, or liquidity for the reporting period. However, it outlines the following operational metrics:
- Production Capacity: Attributable production of more than 4 million ounces per annum from eight operating mines.
- Reserves: Total attributable ore reserves of 92 million ounces and mineral resources of 252 million ounces.
- Workforce: Approximately 53,000 permanent employees.
- Power Allocation: The mining industry received an additional 260 MW of power, allowing consumption to increase from 90% of average historical levels.
- Future Projects: The Cerro Corona Gold/Copper mine in Peru is expected to commence production by mid-2008 at an initial rate of approximately 400,000 gold equivalent ounces per annum.
Material Changes Versus Prior Period
The primary material change reported is the increase in available power supply for South African operations. Previously, mines were restricted to 90% of average historical consumption due to rationing. The new allocation of 260 MW is being phased in over two weeks to mitigate the disruptive impact of power rationing on production, job security, and mine safety.
Guidance, Outlook, and Management Commentary
Management, represented by Terence Goodlace (Head of South African Operations), expressed welcome for the additional power supply, noting it will help limit job losses and positively impact the broader economy. The company plans to review mine plans and production profiles once specific allocations are confirmed, with the goal of increasing production near pre-reduction levels. Management emphasized a continued commitment to energy saving and prioritizing safety while working closely with Eskom and industry peers.
Investor Verification Checklist
- Verify the specific power allocation breakdown for each individual Gold Fields mine to assess the potential for production recovery.
- Monitor the timeline for the Cerro Corona mine in Peru to confirm the mid-2008 production start date.
- Review subsequent quarterly reports for actual production volumes to determine if the power increase successfully restored output to historical averages.