Mcewen Inc. annual report, FY2025

Business Context and Reporting Period

Company: McEwen Inc. (formerly McEwen Mining Inc., renamed July 7, 2025)
Filing Type: Form 10-K Annual Report
Reporting Period: Fiscal year ended December 31, 2025
Business Overview: A gold and silver mining production and exploration company with an advanced copper development project, focused on the Americas. Operations include 100% ownership of the Gold Bar Mine Complex (Nevada, USA) and Fox Complex (Ontario, Canada); a 49% interest in the San José mine (Argentina); and a 46.3% interest in the Los Azules copper project (Argentina). The company also holds exploration assets in Mexico (El Gallo).

Key Financial Metrics (Year Ended Dec 31, 2025)

Metric 2025 Value 2024 Value
Revenue (Gold/Silver Sales) $197.6 million $174.5 million
Gross Profit $47.6 million $30.9 million
Net Income $34.4 million ($0.64/share) Net Loss: $43.7 million ($0.86/share)
Adjusted EBITDA $66.2 million ($1.22/share) $29.2 million ($0.57/share)
Cash from Operating Activities $6.9 million $29.5 million
Capital Expenditures $48.1 million $43.1 million
Cash and Cash Equivalents $51.0 million $13.7 million
Long-Term Debt $126.2 million $40.0 million
Working Capital $44.1 million ($6.5 million)

Note: Revenue excludes the San José mine, which is accounted for under the equity method. Equity income from San José was $41.1 million in 2025.

Material Changes vs. Prior Period

  • Profitability Turnaround: The company returned to profitability with a net income of $34.4 million, reversing a $43.7 million loss in 2024. This was driven by a $16.6 million increase in gross profit, a $32.1 million increase in equity income from Minera Santa Cruz (MSC), and a $24.4 million increase in income tax recovery.
  • Revenue Growth: Revenue increased 13% to $197.6 million, primarily due to a 48% increase in the average realized gold price ($3,532/oz in 2025 vs. $2,390/oz in 2024), partially offset by a 15% decrease in gold equivalent ounces (GEOs) sold from 100% owned operations.
  • Production Volume: Consolidated GEO production decreased to 115,687 ounces (down from 135,884 in 2024). The Fox Complex production was 7% below guidance due to weather-related closures in Q4. Gold Bar production declined due to the transition from the higher-grade Gold Bar South deposit to the lower-grade Pick III deposit.
  • Debt Structure: Long-term debt increased significantly to $126.2 million following the issuance of $110.0 million in 5.25% Convertible Senior Notes due 2030 in February 2025. The company also repaid $20.0 million of its term loan facility.
  • Tax Benefit: A significant portion of the net income was driven by the release of a $30.2 million valuation allowance on U.S. deferred tax assets, based on sustained improvements in operating performance.

Guidance, Outlook, and Risks

Outlook and Guidance (2026)

  • Gold Bar Mine Complex: Expected to produce 39,000–43,000 GEOs. Cash costs: $2,250–$2,450/oz; AISC: $2,350–$2,550/oz.
  • Fox Complex: Expected to produce 16,000–19,000 GEOs. Cash costs: $2,200–$2,400/oz; AISC: $2,350–$2,550/oz.
  • San José Mine (MSC): Expected to produce 59,000–64,000 GEOs. Cash costs: $2,000–$2,200/oz; AISC: $2,300–$2,500/oz.
  • El Gallo (Mexico): Mill construction expected to begin mid-2026, with production commencing mid-2027. Projected to produce ~20,000 GEOs annually for 10 years.
  • Stock Project (Canada): Commercial production targeted for 2027. Development investment in 2025 was $29.5 million.

Key Risks and Contingencies

  • Commodity Price Volatility: Operations are highly dependent on gold, silver, and copper prices. The company does not hedge its production.
  • Geopolitical and Regulatory Risks: Operations in Argentina (San José and Los Azules) face political instability, currency devaluation, and regulatory changes. Operations in Mexico (El Gallo) face security risks related to cartel activity in Sinaloa.
  • Debt Obligations: The company has $110 million in convertible notes and a $20 million term loan. Failure to meet debt obligations could force asset sales or restructuring.
  • Project Execution: Delays in permitting or construction for El Gallo and the Stock project could impact future production targets.
  • Internal Controls: The company remediated a material weakness in internal controls over financial reporting identified in 2024, concluding controls were effective as of December 31, 2025.

Investor Verification Checklist

  • Valuation Allowance Release: Verify the sustainability of the $30.2 million tax benefit and the assumptions regarding future U.S. taxable income.
  • Cost Inflation: Monitor the trend in All-In Sustaining Costs (AISC), which increased significantly in 2025 across all operations (e.g., Fox Complex AISC rose to $2,506/oz from $1,980/oz in 2024).
  • Production Guidance: Track Q1 and Q2 2026 production results against the lowered guidance for the Fox Complex and Gold Bar to assess the impact of lower-grade ore transitions.
  • Debt Covenants: Review compliance with covenants in the new Convertible Notes and the amended Term Loan facility.
  • Argentina Operations: Monitor the impact of Argentine inflation and currency controls on the cash flow and dividend repatriation from the San José mine (MSC).
  • El Gallo Timeline: Confirm the start of mill construction in mid-2026 as a critical milestone for future revenue diversification.