RING ENERGY, INC. current report, 08 September 2009

Ring Energy, Inc. - Form 8-K Summary

Business Context and Reporting Period

This Current Report (Form 8-K) was filed on September 8, 2009, by Ring Energy, Inc., a Nevada corporation. The report discloses a material event regarding an oil and gas lease acquisition in Howard County, Texas, and the results of a test well drilled on the property.

Key Financial Metrics

The filing does not provide comprehensive financial statements, revenue, profit, or liquidity metrics for the company as a whole. Specific financial data related to the disclosed event includes:

  • Investment to Date: Approximately $225,000 in cash payments made through August 18, 2009, for the acquisition of the lease and drilling of the test well.
  • Asset Interest: The company holds a 25% non-operating working interest (18.75% net revenue interest) in a 440-acre lease.
  • Future Costs: The company anticipates incurring additional costs for a plugback and recompletion program at a shallower depth.

Material Changes and Operational Events

The primary material change concerns the operational status of the "Prospect" lease in Howard County, Texas, operated by Big Star Oil and Gas, LLC:

  • Test Well Results: A test well drilled to approximately 7,700 feet was determined not to be commercially productive at that depth.
  • Recompletion Plan: The operator is finalizing a program to plug back and recomplete the well at a shallower depth.
  • Impairment Status: The company is evaluating the investment for impairment but will not recognize any impairment until the results of the recompletion are known.

Outlook, Risks, and Management Commentary

Management and the operator, Big Star, believe that a commercially productive well can still be achieved through the shallower recompletion. However, the filing explicitly states that no assurance can be given regarding the success of this plan. The primary risk is the potential for the asset to remain non-productive, which could lead to future impairment charges and additional capital expenditures without return.

Investor Verification Checklist

  • Verify the timeline and estimated cost of the proposed plugback and recompletion program.
  • Monitor future filings for the results of the shallower depth completion and any subsequent impairment charges.
  • Confirm the total capital commitment required to bring the well to production versus the company's current liquidity position.
  • Review the operator's (Big Star Oil and Gas, LLC) track record with similar recompletion projects.