Annual report for the fiscal year ended December 31, 2011. FirstEnergy is an electric utility holding company with regulated distribution and transmission operations and competitive generation and energy-supply businesses across six states. The results include Allegheny Energy from its February 25, 2011 merger, providing approximately ten months of acquired operations.

Financial performance and liquidity

  • Revenue was $16.258 billion, up 21.9% from $13.339 billion in 2010, largely reflecting the Allegheny merger. Operating income was $1.698 billion, down from $1.743 billion; operating margin declined to approximately 10.4% from 13.1%.
  • Net income was $869 million and earnings available to FirstEnergy were $885 million, compared with $718 million and $742 million, respectively, in 2010. Diluted EPS fell to $2.21 from $2.42, reflecting the higher weighted-average share count following the merger. The 2011 results included a $569 million pre-tax gain on the partial sale of Signal Peak.
  • Cash from operations was $3.063 billion, essentially level with $3.076 billion in 2010. Property additions were $2.278 billion. Cash and cash equivalents ended the year at $202 million, down from $1.019 billion.
  • At year-end, long-term debt and other long-term obligations were $15.716 billion and currently payable long-term debt was $1.621 billion; short-term borrowings were zero. Total equity was $13.299 billion. Available liquidity at January 31, 2012 was $4.392 billion, including $4.343 billion of available credit and $49 million cash.
  • Common dividends declared were $2.20 per share, unchanged from 2010. FirstEnergy reported $47.326 billion in total assets.

Material changes versus 2010

  • Allegheny’s acquisition substantially expanded reported revenue, assets, debt, generation and customer base. FirstEnergy issued approximately 113 million shares in the merger.
  • FirstEnergy reported $570 million of Regulated Distribution earnings, $377 million from Competitive Energy Services and $112 million from Regulated Independent Transmission. Competitive Energy Services benefited from the Signal Peak gain, while earnings per share declined as the share count increased.
  • FirstEnergy recognized $413 million of long-lived-asset impairment charges. A $334 million pre-tax charge, or $207 million after tax, related to planned coal-plant retirements. Pension and OPEB mark-to-market expense rose to $507 million from $190 million following a change to immediate recognition of actuarial gains and losses; prior periods were retrospectively restated.
  • ATSI moved from MISO to PJM on June 1, 2011, and the TrAIL transmission line was completed. FirstEnergy also sold Fremont Energy Center for $510 million and sold the Richland and Stryker peaking facilities for approximately $80 million.

Outlook, commentary, risks and contingencies

  • Management forecast approximately $2.1 billion of 2012 capital spending, excluding nuclear fuel, and approximately $2.0 billion of baseline spending in 2013. Nuclear-fuel investment was forecast at $280 million in 2012 and $219 million in 2013. No explicit numeric 2012 EPS guidance is provided in the filing text presented.
  • Management identified a full-year Allegheny contribution, retail growth, lower fuel and operating costs from retirements and lower interest expense as potential 2012 earnings positives. Depressed power and capacity prices, higher Pennsylvania gross-receipts taxes and increased depreciation were cited as negatives.
  • FirstEnergy announced plans to retire nine coal-fired plants totaling 3,349 MW by September 1, 2012, subject to PJM reliability review. Management estimated $1.3–$1.7 billion to bring remaining units into environmental compliance. PJM’s preliminary review identified significant reliability concerns requiring resolution, so closures and timing remain uncertain.
  • Key environmental exposures include MATS and other emissions requirements, proposed water-intake and coal-combustion-residual rules, and water-quality disputes that could require significant investment. The filing does not provide a clear estimate for many related contingencies.
  • Other items to monitor include the $254 million Met-Ed/Penelec marginal transmission-loss recovery dispute; FTR underfunding losses of about $35 million for the 2010–2011 delivery year and an estimated $6 million to date for 2011–2012; and environmental remediation liabilities accrued at approximately $106 million.
  • FirstEnergy reported a $2.6 billion underfunded status for pension and OPEB plans at year-end and made a $600 million voluntary pension contribution on January 5, 2012. The filing also cites Davis-Besse shield-building cracks; experts found no impact on structural integrity or safety, but NRC review continued. Perry was subject to enhanced NRC oversight.
  • Management cited a $48 million settlement of spent-fuel claims against the DOE and a $104 million trial judgment for AE Supply and MP in a coal-supply dispute, which the defendant appealed. Outstanding guarantees and other assurances totaled approximately $3.7 billion; additional credit-contingent obligations were $636 million.

Most important facts for investors to verify

  • Separate merger-driven revenue and earnings growth from underlying performance; review the Signal Peak gain, plant impairments and pension-accounting change.
  • Track PJM’s reliability determination and the actual timing, capacity and costs of the planned 3,349 MW retirements.
  • Assess the affordability and recovery of environmental compliance spending, particularly the $1.3–$1.7 billion estimate and unresolved water-related requirements.
  • Follow material regulatory and legal outcomes, including the $254 million transmission-loss dispute, FTR underfunding complaint and coal-supply appeal.
  • Monitor pension funding after the $600 million contribution, available liquidity, debt maturities and any collateral requirements triggered by credit or commodity-market changes.