Business Context and Reporting Period
Company: Deep Fission, Inc.
Filing Type: Form 10-K (Annual Report)
Period Covered: Fiscal year ended December 31, 2025
Business Overview: Deep Fission is a pre-revenue nuclear energy technology company developing the "Gravity Reactor," a small modular reactor (SMR) based on established pressurized water reactor (PWR) technology emplaced in deep boreholes (approx. one mile underground). The company is currently participating in the U.S. Department of Energy (DOE) Reactor Pilot Program. In September 2025, the company completed a reverse merger with Surfside Acquisition Inc. to become a public company.
Key Financial Metrics
| Metric | 2025 (Restated) | 2024 (Restated) |
|---|---|---|
| Revenue | $0 | $0 |
| Net Loss | $(61.0) million | $(5.7) million |
| Operating Expenses | $21.4 million | $4.1 million |
| Cash and Cash Equivalents (Dec 31, 2025) | $23.7 million | $6.7 million |
| Accumulated Deficit (Dec 31, 2025) | $(66.7) million | $(5.7) million |
| Net Cash Used in Operating Activities | $(13.1) million | $(2.8) million |
| Net Cash Provided by Financing Activities | $30.1 million | $8.6 million |
Note: The 2024 financial statements and certain interim periods have been restated to correct material accounting errors related to the valuation of SAFE Notes and stock-based compensation.
Material Changes vs. Prior Period
- Net Loss Expansion: Net loss increased by approximately $55.3 million (968%) year-over-year. This was primarily driven by a $39.8 million non-cash loss recorded from the change in fair value of SAFE Notes upon their conversion to common stock during the September 2025 Merger.
- Operating Expenses: Total operating expenses increased by $17.3 million (421%). General and administrative expenses rose by $11.3 million, and R&D expenses rose by $6.0 million, attributable to increased headcount, stock-based compensation, and legal costs associated with the Merger and public company status.
- Capital Structure: The company completed a reverse merger and a concurrent private placement in September 2025, raising $30.0 million. In February 2026 (subsequent event), the company raised an additional $80.0 million ($76.0 million net proceeds).
- Restatement: Previously issued financial statements for 2024 and interim periods in 2025 were restated due to errors in SAFE Note valuations and stock-based compensation calculations.
Guidance, Outlook, Risks, and Unusual Items
Outlook and Guidance
- Development Timeline: The company aims to complete drilling and engineering validation in the coming months. It plans to apply for a commercial license with the NRC in the first half of 2027, converting a pilot reactor to commercial operation.
- Capital Requirements: Management estimates a need for approximately $200 million in additional capital to complete development, licensing, and commercial deployment of the first commercial reactor. They believe an initial test reactor could be operational with approximately half that amount.
- Going Concern: The auditor has issued a "going concern" opinion. Management states that existing cash and proceeds from the February 2026 private placement will not be sufficient to fund operations for the next twelve months without additional financing.
Risks and Contingencies
- Internal Control Weaknesses: The company identified material weaknesses in internal control over financial reporting related to IT general controls, segregation of duties, and the preparation of accounting estimates (SAFE Notes and stock-based compensation). Disclosure controls and procedures were deemed ineffective as of December 31, 2025.
- Regulatory Uncertainty: Commercial operation requires NRC licensing. The company is currently operating under a DOE authorization (OTA) which does not permit commercial operation. The company is also a plaintiff in litigation challenging the NRC's licensing framework.
- Technology Risk: The Gravity Reactor is unproven. Success depends on the ability to drill deep boreholes, maintain subsurface stability, and obtain regulatory approvals.
- Financing Risk: The company has no revenue and requires substantial additional capital. There is no assurance that financing will be available on acceptable terms.
Unusual Items
- SAFE Note Conversion Loss: A significant portion of the 2025 net loss ($39.8 million) was a non-cash charge resulting from the conversion of SAFE Notes into common stock at the Merger closing.
Investor Verification Checklist
- Restatement Details: Review Note 2 of the financial statements to understand the specific adjustments made to the 2024 and interim 2025 financials regarding SAFE Note valuations and stock-based compensation.
- Internal Control Remediation: Verify the progress of remediation efforts for the identified material weaknesses in internal controls over financial reporting (Item 9A).
- Capital Sufficiency: Assess the timeline and certainty of raising the estimated $200 million required for commercial deployment, given the "going concern" warning.
- Regulatory Pathway: Monitor the status of the DOE Reactor Pilot Program authorization and the outcome of the litigation against the NRC, as these are critical to the commercialization timeline.
- Subsequent Events: Confirm the final valuation and terms of the February 2026 private placement ($80 million gross) and the $9.2 million commitment for low-enriched uranium fuel.