Cheniere Energy Partners, L.P. current report, 28 May 2013

Business Context and Reporting Period

Company: Cheniere Energy Partners, L.P.
Filing Type: Form 8-K (Current Report)
Date of Report: May 28, 2013
Reporting Period: Events occurring on May 28 and May 29, 2013.

This filing details significant capital structure changes, asset acquisitions, and project milestones related to the Sabine Pass LNG terminal and the Creole Trail Pipeline. The Partnership secured major financing for its liquefaction project, acquired full ownership of its pipeline subsidiary, and initiated construction on additional LNG trains.

Key Financial Metrics and Capital Structure

Debt Facilities Established:

  • Sabine Pass Liquefaction (SPL) Credit Facilities: Totaling approximately $5.9 billion.
    • Term Loan A: ~$4.4 billion.
    • KEXIM Direct Facility: $420 million.
    • KEXIM Covered Facility: $330 million.
    • KSURE Covered Facility: $750 million.
  • Cheniere Creole Trail Pipeline (CTPL) Credit Facility: $400 million term loan.

Acquisition Costs:

  • CTPL Equity Acquisition: $480 million cash consideration plus approximately $8.3 million in reimbursed expenditures.

Equity Transactions:

  • At-the-Market (ATM) Program: Authorized sale of up to $500 million in common units via Mizuho Securities USA Inc.
  • Unregistered Sale: Issuance of 12,000,000 Class B Units to Cheniere Class B Units Holdings, LLC for $180 million.

Financial Covenants (SPL):

  • Debt Service Coverage Ratio (DSCR): Minimum 1.15x required post-completion (with cure provisions for ratios between 1.00x and 1.15x).
  • Debt-to-Equity Ratio: Replacement debt must not exceed a 75:25 ratio.
  • Interest Rate Hedging: Required to hedge at least 75% of floating rate senior secured debt.

Revenue, Profit, and Cash Flow: The filing text does not provide specific revenue, profit, or cash flow figures for the period. It focuses on capital raising and project financing.

Material Changes Versus Prior Period

  • Debt Load: Significant increase in indebtedness with the closing of $6.3 billion in new credit facilities ($5.9B for SPL and $400M for CTPL).
  • Ownership Structure: The Partnership completed the acquisition of 100% of the equity interests in Cheniere Pipeline GP Interests, LLC and the limited partner interest in CTPL, consolidating full control of the Creole Trail Pipeline.
  • Project Status: Issued a "Notice to Proceed" to Bechtel for the construction of the third and fourth LNG liquefaction trains at the Sabine Pass facility.
  • Liquidity Strategy: Established an ATM program to raise up to $500 million in equity capital over time.

Guidance, Outlook, Risks, and Contingencies

Outlook and Project Milestones:

  • SPL Project: Financing is intended to fund the first four LNG trains (182.5 million MMBtu/year capacity each). Repayment of principal begins after project completion, with a balloon payment due at maturity (May 28, 2020, or second anniversary of completion).
  • CTPL Project: Financing funds a 94-mile pipeline interconnecting Sabine Pass with interstate pipelines. Modifications are expected to be in service for the commissioning of Train 1 and Train 2.
  • Regulatory Approvals: Final FERC approval for CTPL modifications is expected in the third quarter of 2013. Title V and PSD permits are anticipated in 2013 but not guaranteed.

Risks and Contingencies:

  • Regulatory Risk: Operations are subject to FERC regulation under the Natural Gas Act. Failure to comply could result in penalties up to $1.0 million per day. FERC approval is required for rate deviations and facility construction.
  • Construction and Completion Risk: Failure to complete the SPL Project within specified timeframes or meet commercial delivery deadlines constitutes an event of default.
  • Third-Party Dependence: The CTPL pipeline relies on interconnections with third-party pipelines; interruptions could materially reduce volumes and revenues.
  • Land Rights: The Partnership does not own the land for the CTPL pipeline and faces risks regarding the retention of land use rights.
  • Interest Rate Exposure: Loans bear variable interest rates (LIBOR or Base Rate plus margin), exposing the company to rate fluctuations despite hedging requirements.

Investor Verification Checklist

  • Debt Servicing Capacity: Verify the projected cash flows of the SPL Project against the $5.9 billion debt load and the 1.15x minimum DSCR covenant.
  • Regulatory Timelines: Confirm the status of the pending FERC rehearing and stay regarding CTPL modifications, as delays could impact the commissioning of LNG Trains 1 and 2.
  • Construction Progress: Monitor the "Notice to Proceed" for Trains 3 and 4 and the associated capital expenditure schedule to ensure alignment with the $5.9 billion facility drawdown conditions.
  • Equity Dilution: Track the utilization of the $500 million ATM program and the impact of the $180 million Class B Unit issuance on existing unit holders.
  • Interest Rate Hedging: Review the execution of interest rate protection agreements required to cover at least 75% of floating rate debt to mitigate margin compression risks.