Ivanhoe Electric Inc. annual report, FY2023

Ivanhoe Electric Inc. — 2023 Form 10-K

Reporting period: Fiscal year ended December 31, 2023; comparisons are with fiscal 2022. This is an annual report, not a standalone fourth-quarter report. Ivanhoe Electric is an exploration-stage minerals company focused mainly on copper, with data-processing and vanadium-battery businesses. It had no operating mines and generated no mining revenue.

Financial performance and liquidity

Metric20232022
Revenue$3.9 million$8.4 million
Gross profit$0.9 million; 23.5% gross margin$5.3 million; 62.9% gross margin
Operating expenses$181.3 million$137.5 million
Operating loss$180.4 million$132.2 million
Net loss$216.1 million consolidated; $199.4 million attributable to common stockholders$160.2 million consolidated; $149.8 million attributable to common stockholders
Loss per share$1.95$1.91
Cash used in operating activities$150.5 million$115.7 million
Cash and cash equivalents at year-end$205.0 million$139.7 million
Working capital at year-end$176.8 million$133.6 million
Total assets / total liabilities$487.2 million / $110.9 million$260.5 million / $58.0 million

Revenue fell 54%, principally because 2022 included a one-time $6.5 million software license fee. CGI revenue was $1.3 million, down from $7.7 million; VRB revenue rose to $2.6 million from $0.7 million. VRB reported $0.1 million gross profit, versus a $1.8 million gross loss in 2022. No consolidated operating or net profit was reported.

Exploration expense increased to $126.7 million from $105.3 million, while general and administrative expense rose to $48.2 million from $27.0 million. The latter included $17.0 million of non-cash stock-based compensation, versus $2.0 million in 2022. Share of losses from significant-influence investments increased to $36.0 million, largely reflecting Ivanhoe Electric’s $34.4 million share of the Ma’aden joint venture loss after the JV expensed the value of land-access rights. The 2022 net loss included a $19.0 million non-cash convertible-debt revaluation loss that did not recur.

Investing activities used $150.8 million, including $80.5 million for exploration-property acquisitions and $68.7 million for investments, principally the Ma’aden JV. Financing activities provided $366.5 million, including $319.6 million of net common-stock proceeds. Year-end cash included $15.0 million held by non-wholly owned subsidiaries and unavailable for general corporate purposes. Management stated that, as of February 26, 2024, available cash was expected to fund plans for at least 12 months; additional financing is expected thereafter.

At December 31, 2023, the Santa Cruz secured note had a $48.9 million balance, bearing interest at prime plus 1%, with four annual principal installments of approximately $12.1 million remaining. VRB convertible debt was $28.4 million including accrued interest and matures in 2026 if not converted. Cordoba’s $4.0 million related-party loan was repaid in January 2024. Total liabilities were $110.9 million. No material off-balance-sheet arrangements were reported.

Projects, changes, and outlook

  • Santa Cruz, Arizona: The 2023 Initial Assessment describes a proposed underground copper operation with a modeled 20-year production life. The reported after-tax NPV at 8% is approximately $458 million without inferred resources and $1.317 billion including them; corresponding IRRs are 14% and 23%, with payback periods of 10 and 7 years. The assessment is preliminary, uses mineral resources rather than reserves, and the inferred-resource case is especially speculative. Santa Cruz had no mineral reserves at year-end. The company is advancing a pre-feasibility study, infill drilling, technical work, and permitting.
  • Tintic, Utah: Exploration continued, including deep drilling guided by geophysical surveys. Tintic had no mineral resources or reserves at year-end; further drilling and field exploration are planned.
  • Ma’aden JV: Ivanhoe Electric and Ma’aden formed a 50/50 Saudi exploration JV with access to approximately 48,500 km². Ivanhoe Electric contributed about $66 million to the JV and licensed Typhoon technology for exploration. Ma’aden also invested approximately $127.1 million in Ivanhoe Electric shares and has top-up rights that may cause future dilution.
  • Alacran, Colombia: Cordoba completed a feasibility study reporting estimated initial capital of $420.4 million, after-tax NPV of $360 million, IRR of 23.8%, and a 14-year mine life. The project has probable reserves, but development depends on financing, permitting, and other execution steps. The environmental impact assessment was filed in December 2023; a further $20 million JCHX payment depends on EIA approval. Ivanhoe Electric owned 62.8% of Cordoba at year-end.
  • Other developments: Ivanhoe Electric completed a public offering and Ma’aden share issuances in 2023, increasing outstanding shares from 93.0 million to 120.0 million by year-end. On February 6, 2024, it acquired the remaining Kaizen shares, making Kaizen wholly owned, in exchange for 116,413 Ivanhoe Electric shares.

Management expects continued losses and negative operating cash flow while exploration and development proceed, and says future operations will require additional capital. The company is evaluating renewable power and water-management approaches at Santa Cruz and recommends further study rather than presenting a producing-mine forecast. The Santa Cruz assessment’s economics are sensitive to resource classification, grades, copper prices, and recovery assumptions.

Risks, contingencies, and unusual items

  • The company has no operating mines, a history of net losses and negative operating cash flow, and substantial future funding needs. Exploration may not identify economically mineable deposits; resource estimates are uncertain and are not equivalent to reserves.
  • Permitting, environmental requirements, water availability, construction costs, commodity prices, land title, and community relations may delay or prevent development. Santa Cruz’s secured note must be repaid before material construction can begin.
  • Cordoba faces an Alacran Community class action seeking injunctions, as well as a separate ongoing criminal proceeding against former management. The class action’s outcome is uncertain and could affect the project.
  • International exposure includes security and political risks in Colombia and Peru, and regulatory, foreign-exchange, and geopolitical risks affecting VRB’s operations in China. VRB also faces supplier, manufacturing, competition, and alternative-technology risks.
  • Stock issuances, equity compensation, and Ma’aden’s top-up rights may dilute existing holders. The company does not intend to pay dividends in the foreseeable future.
  • The audited financial statements received an unqualified opinion, and management and the auditor reported effective internal control over financial reporting at year-end.

Investor facts to verify

  • Whether cash burn, restricted subsidiary cash, debt installments, and planned project spending support the stated 12-month funding outlook—and when additional financing may be needed.
  • Santa Cruz’s updated study assumptions, resource conversion prospects, capital and sustaining-cost estimates, required permits, water plan, and repayment of the secured land note before construction.
  • Progress toward Santa Cruz pre-feasibility work and Tintic exploration results; neither project had reserves at year-end.
  • Alacran EIA approval, the contingent JCHX payment, project financing, and the status and potential effect of Cordoba litigation.
  • Ma’aden JV exploration progress, Typhoon equipment delivery, accounting for JV costs, and the potential share dilution from top-up rights.
  • VRB’s ability to grow revenue and margins, secure materials, scale manufacturing, and manage China-related operating and regulatory exposure.