SOUTHERN COPPER CORP quarterly report, Q3 FY2026

Southern Copper Corporation — Q3 2026 Form 10-Q

Reporting period: Three and nine months ended September 30, 2026; comparison with the corresponding 2025 periods. Southern Copper is an integrated copper and metals producer operating primarily in Peru and Mexico. Grupo Mexico indirectly owned 88.9% as of quarter-end. Financial statements are unaudited and were reviewed by the independent accountant.

Financial and operating performance

MetricQ3 2026Q3 2025Nine months 2026Nine months 2025
Net sales$4,696.6 million$3,377.3 million$13,237.0 million$9,550.2 million
Operating income$2,815.1 million$1,768.8 million$7,918.7 million$4,891.3 million
Net income attributable to SCC$1,801.8 million$1,107.6 million$5,048.6 million$3,027.0 million
EPS, basic and diluted$2.15$1.32$6.08$3.65
Operating margin59.9%52.4%59.8%51.2%
  • Q3 sales rose 39.1% and attributable earnings rose 62.7%; nine-month sales rose 38.6% and attributable earnings rose 66.8%. Management attributed the gains mainly to higher metal prices, with operating costs rising more slowly than sales.
  • Q3 and nine-month copper sales volumes declined 0.4% and 2.3%, respectively. Nine-month mine production declined 2.9% for copper, 5.2% for molybdenum and 7.2% for zinc; silver production increased 1.5%.
  • Metal prices were substantially higher year over year. Q3 average prices increased 44.4% for LME copper, 35.5% for molybdenum, 58.7% for silver and 35.9% for zinc.
  • Cash cost per pound of copper before by-product credits increased to $2.35 for nine months from $2.13. After by-product credits, the non-GAAP cost was $0.01 per pound versus $0.61, reflecting higher by-product revenues. This measure is particularly sensitive to by-product prices.

Cash flow, liquidity and debt

  • Nine-month operating cash flow was $5,907.3 million, up from $3,257.8 million. Capital expenditures were $1,380.5 million, versus $902.7 million; operating cash flow less capital expenditures was approximately $4,526.8 million.
  • Cash and cash equivalents were $4,823.7 million at September 30, 2026, and short-term investments were $3,239.2 million, compared with $4,304.6 million and $604.6 million, respectively, at December 31, 2025. Cash plus short-term investments totaled $8,062.9 million.
  • Long-term debt was $7,995.9 million, up from $6,750.7 million at year-end 2025. In June, the company issued $1.25 billion of unsecured notes due 2036 at 5.350%; proceeds are designated for Tia Maria, Peruvian capital spending and/or other Peruvian corporate purposes.
  • Nine-month cash dividends paid were $2,563.2 million. The board subsequently authorized a $1.30-per-share cash dividend and a 0.0106-share stock dividend, payable November 19, 2026.

Changes, outlook and material matters

  • Higher commodity prices were the principal earnings driver; volumes and production were mixed, with declines at several Peruvian mines partly offset by stronger Buenavista copper output. Fuel, labor and other operating costs increased, and Q3 expenses included a $28.7 million Sonora social-program contribution.
  • Management expects 2026 copper production of 918,000 tonnes, zinc production of 163,400 tonnes, molybdenum production of 29,000 tonnes and silver production of 24 million ounces. These are estimates, not guarantees. Management estimated a slight copper-market surplus in 2026.
  • Tia Maria was 49.6% complete at September 30; management expects operations to begin in the first half of 2028. El Pilar construction is expected to start in Q1 2027, with production targeted for the second half of 2029. The company cautions that future projects and timing remain subject to estimates, approvals and other conditions.
  • Approximately $1.733 billion of capital project commitments remained at quarter-end. The company expects to fund capital needs with cash, internally generated funds and external financing. Capital investment plans may be adjusted for economic and market conditions.
  • Key legal exposures include Peruvian labor-share litigation, multiple Tia Maria-related cases and claims associated with the 2014 Buenavista spill. Management says some potential contingency amounts cannot be reasonably estimated; it considers certain claims without merit and is defending them. Labor disputes continue at San Martin and Taxco; Taxco remains suspended.
  • Environmental and regulatory matters include mine-closure guarantees and evolving Mexican mining and water laws. The company states it believes it is materially compliant and does not expect the cited Mexican law amendments to negatively affect operations. Newly highlighted risks include geopolitical conflict, supply-chain and energy disruption, and cyberattacks, including those enabled by AI.
  • Management reported disclosure controls were effective and no material change in internal control occurred during the quarter. The interim accountant’s review found no material modifications necessary for GAAP conformity; this was a review, not an audit.

Important facts for investors to verify

  • Whether metal prices and by-product revenues can sustain the unusually strong earnings and near-zero reported net cash cost per pound.
  • Progress against production expectations, especially copper output at Toquepala and Cuajone and zinc output at Buenavista and IMMSA.
  • Capital spending, committed project funding and execution milestones for Tia Maria and El Pilar, including permitting, community and construction risks.
  • Debt terms, future financing needs, dividend cash requirements and the composition and liquidity of short-term investments.
  • Developments in the Tia Maria, labor-share and Buenavista spill proceedings, for which some potential exposure is not quantifiable.
  • Metal-price, fuel and energy cost, exchange-rate, geopolitical, regulatory, environmental and cybersecurity risks.
Disclaimer:
This AI-generated summary by MetaQuotes is based on SEC filings and may contain errors. Verify important details against the original SEC filings.