UR-ENERGY INC current report, 07 December 2015

Business Context and Reporting Period

UR-ENERGY INC. filed this Form 8-K on December 7, 2015, to report an updated uranium resource estimate for its Lost Creek Property in Sweetwater County, Wyoming. The property, consisting of approximately 42,000 acres, is a fully-permitted project where production began in 2013. This filing represents the second resource increase for the property in 2015, driven by wellfield development drilling in Mine Unit 2 (MU2) and the completion of the second phase of the 2015 exploration drilling program.

Key Financial and Operational Metrics

This filing focuses on mineral resource estimates rather than financial performance metrics. The filing text does not provide clear values for revenue, profit, cash flow, margins, debt, or liquidity.

Resource Category Current Estimate (0.20 GT Cut-off) Net Increase vs. June 2015
Measured and Indicated 13.25 million pounds eU3O8 +3.15 million pounds eU3O8
Inferred 6.44 million pounds eU3O8 +1.40 million pounds eU3O8

Note: Estimates are net of 1.358 million pounds of MU1 production through September 30, 2015.

Material Changes Versus Prior Period

Compared to the June 17, 2015 Technical Report, the resource estimate increased significantly due to three primary factors:

  • Lower Cut-off Grade: All previously identified resources were revised using a 0.20 grade-thickness (GT) cut-off, down from 0.30 GT, based on better-than-expected uranium recoveries from mining operations.
  • Mine Unit 2 (MU2) Development: Drilling of 138 close-spaced pattern wells, 20 monitor wells, and 22 delineation holes increased MU2 resources by 682,000 pounds (Measured and Indicated) and 185,000 pounds (Inferred).
  • Exploration Drilling: A 150-hole exploration program south and east of MU1 added resources. Phase 1 (Q1 2015) added 121,000 pounds (Measured and Indicated) and 296,000 pounds (Inferred). Phase 2 (Q3 2015) added 18,000 pounds (Measured and Indicated) and 202,000 pounds (Inferred).

The application of the lower GT cut-off resulted in a net increase of 2.446 million pounds in Measured and Indicated categories and 1.015 million pounds in the Inferred category across the remainder of the property, though it caused a slight decrease in average grades.

Guidance, Outlook, and Risks

Outlook: The Company anticipates commencing production in MU2 in 2016. An updated NI 43-101 technical report updating the resource estimate within the Preliminary Economic Assessment is expected to be filed within 45 days of December 7, 2015.

Risks and Contingencies: The filing includes a cautionary note for U.S. investors stating that the terms "Measured," "Indicated," and "Inferred" Mineral Resources are not recognized by the U.S. Securities and Exchange Commission. Investors are cautioned not to assume that any part of these mineral deposits will ever be converted into Mineral Reserves.

Key Facts for Investor Verification

  • Verify the upcoming NI 43-101 technical report (due within 45 days of Dec 7, 2015) for the updated Preliminary Economic Assessment.
  • Confirm the timeline and capital requirements for commencing production in Mine Unit 2 in 2016.
  • Review the impact of the 0.20 GT cut-off on average grades and potential future production costs.
  • Understand that the reported resources are not SEC-recognized reserves and may not be economically extractable.