CENTRAL PUERTO S.A. current report, Q2 FY2023

Central Puerto S.A. 1Q2023 Financial Summary

Business Context and Reporting Period

This Form 6-K reports the consolidated financial results for Central Puerto S.A. for the first quarter of 2023 (ended March 31, 2023). The company is a major private power generator in Argentina. Financial statements are presented in Argentine Pesos (Ps.) adjusted for inflation under IAS 29, meaning figures are stated in terms of the measuring unit current at the end of the reporting period. Consequently, these figures are not directly comparable to previously published historical statements without adjustment.

Key Financial Metrics

Metric1Q2023 (Million Ps.)1Q2022 (Million Ps.)Variance
Revenues27,94435,054(20%)
Gross Profit10,98619,544(44%)
Operating Income23,89126,422(10%)
Adjusted EBITDA29,84732,179(7%)
Net Income1299,779(99%)
Cash and Cash Equivalents (End of Period)10,940643 (3M2022)N/A
Consolidated Net Debt(33,005)N/AN/A

Operational Highlights: Energy generation increased 12% to 5,137 GWh. Installed capacity rose 48% to 7,114 MW, driven by the acquisition of Central Costanera. Thermal unit availability was 73%, down from 84% in 1Q2022 due to technical failures at the Puerto site.

Material Changes vs. Prior Period

  • Revenue Decline: Revenues fell 20% primarily due to a 36% drop in sales under contracts (ending of Brigadier Lopez TG PPA) and a 7% decrease in Spot/Energía Base sales. These were partially offset by new revenues from Central Costanera.
  • Profitability Compression: While Operating Income declined only 10%, Net Income collapsed 99% to Ps. 129 million. This was driven by a Ps. 13.7 billion loss on net monetary position (inflation adjustment) and increased financial expenses (Ps. 14.7 billion) due to peso depreciation.
  • Acquisitions: The company acquired 75.68% of Enel Generación Costanera S.A. (Central Costanera) for US$ 48.0 million in February 2023 and the EVASA forestry group in May 2023. These acquisitions significantly increased installed capacity and contributed to costs and revenues in the quarter.
  • Market Conditions: Argentine inflation was 17% in 1Q2023. Energy demand in the national market grew 14%, with residential demand up 25% due to high temperatures.

Guidance, Outlook, and Risks

Management Commentary: Management expects the income increase from the Central Costanera acquisition and Resolution 826/2022 tariff adjustments to be fully verified throughout 2023. The company aims to increase power availability at Costanera to cover national demand. The impact of the expired Brigadier Lopez PPA is expected to be recovered with a new contract upon completion of the combined cycle by the end of 2024.

Risks and Contingencies:

  • Macroeconomic Volatility: Significant exposure to Argentine peso depreciation and high inflation, which negatively impacts net monetary position and financial expenses.
  • Operational Reliability: Technical failures at the Puerto site reduced thermal availability to 73% in 1Q2023.
  • Regulatory Dependence: Revenue is heavily influenced by government resolutions regarding tariffs (e.g., Resolution 826/2022, Resolution 59/2023).

Investor Verification Checklist

  • Inflation Adjustment Impact: Verify the specific IAS 29 adjustments applied to ensure comparability with prior periods, as the filing explicitly states figures are not comparable to previously published statements.
  • FX Exposure: Confirm the magnitude of foreign exchange losses on FONI trade receivables and the sensitivity of future earnings to peso depreciation.
  • Acquisition Integration: Assess the timeline for realizing synergies from the Central Costanera and EVASA acquisitions and the associated debt servicing costs.
  • PPA Renewal: Monitor the progress of the new PPA contract for the Brigadier Lopez steam turbine to confirm the recovery of lost revenue.
  • Liquidity Position: Review the consolidated net debt position of Ps. 33 billion and the company's ability to service debt amidst high inflation and interest rates.