FORD MOTOR CO current report, 23 June 2009

Ford Motor Company — Form 8-K Summary

Reporting context: Filed for an event dated June 23, 2009. Ford reported a conditional U.S. Department of Energy (DOE) commitment under the Advanced Technology Vehicles Manufacturing (ATVM) Program. This filing provides financing terms, not operating results.

Financing terms and key metrics

  • DOE is willing to arrange a 13-year, multi-draw term loan facility of up to $5.937 billion, initially to fund part of approved ATVM expenditures through 2011. Ford’s earlier application sought $11.4 billion; further loans for expenditures beyond 2011 require additional DOE approval.
  • Proceeds are intended for eligible costs across 13 DOE-approved advanced-technology vehicle programs. Borrowing for each project is limited and depends on Ford meeting agreed project milestones and fuel-economy targets.
  • Advances may be requested after definitive agreements are completed and through June 30, 2012. The loans mature June 15, 2022; equal quarterly principal payments are scheduled to begin September 15, 2012. Each advance bears interest at a rate based on the Treasury yield curve when borrowed, with interest payable quarterly.
  • The facility would be secured by assets acquired or developed with loan proceeds and by collateral also pledged under Ford’s existing credit agreement, subject to specified prior liens and permitted liens. Certain domestic subsidiaries would guarantee the obligations.
  • Loan documents are expected to require at least $4 billion of domestic cash, cash equivalents, loaned and marketable securities, short-term VEBA assets, and/or revolving-credit availability.

Material changes and conditions

  • Ford and DOE amended and restated the application on June 12, 2009, reducing the initial requested facility amount to $5.937 billion from the original $11.4 billion application.
  • The commitment is conditional on definitive loan documents and DOE’s satisfaction with legal, tax, accounting, capital-structure, and other matters; required governmental and third-party consents; and other specified conditions.
  • To provide the contemplated second-lien security, Ford must obtain amendments increasing the second-lien debt limits in both its existing credit agreement and its $3 billion 9.5% secured note from $4 billion to $14 billion. The credit-agreement amendment requires approval by lenders holding a majority of outstanding principal or commitments.
  • Loan documents are expected to include affirmative and restrictive covenants, including limits on certain dividends, equity repurchases, debt repayment, secured borrowing, mergers, and liens. Events of default include payment or covenant defaults, certain cross-defaults, bankruptcy, specified judgments, change in control, and certain project-funding failures.

Outlook, risks, and unusual items

Ford anticipated completing the loan documents and satisfying conditions, including the required second-lien amendments, by August 2009; draws could begin afterward. This was an expectation, not confirmation that the facility closed or funds were drawn. The commitment could fail to become effective if conditions are not met. The filing does not report revenue, profit, cash flow, margins, or current debt and liquidity balances.

Important facts for investors to verify

  • Whether definitive loan documents were executed and all DOE conditions were satisfied.
  • Whether the required lender and noteholder amendments to second-lien limits were approved.
  • Whether Ford drew funds, the amounts and timing of advances, and the resulting interest and repayment obligations.
  • Whether Ford met project milestones, fuel-economy targets, and the $4 billion minimum-liquidity covenant.
  • Whether additional DOE approval was obtained for funding eligible expenditures beyond 2011.
Disclaimer:
This AI-generated summary by MetaQuotes is based on SEC filings and may contain errors. Verify important details against the original SEC filings.