CENTRAL PUERTO S.A. current report, Q4 FY2021

Business Context and Reporting Period

Company: Central Puerto S.A. (NYSE: CEPU), a major private sector power generator in Argentina.
Reporting Period: Third Quarter (3Q) and nine-month period (9M) ended September 30, 2021.
Filing Date: November 9, 2021.
Accounting Standard: Financial statements are adjusted for inflation under IAS 29. Figures are stated in the measuring unit current at the end of the reporting period (Argentine Pesos).

Key Financial Metrics

Metric (Million Ps.) 3Q 2021 3Q 2020 9M 2021 9M 2020
Revenues 13,297 13,843 39,013 39,481
Operating Income 5,651 9,886 17,646 31,285
Adjusted EBITDA 7,980 11,712 24,803 37,123
Net Income (Loss) 2,689 3,487 (1,359) 8,735
EPS (Ps.) 1.77 2.30 (0.94) 5.77
Net Debt Position (Consolidated) (29,744) as of Sept 30, 2021
Cash & Equivalents 276 as of Sept 30, 2021

Material Changes vs. Prior Period

  • Revenue Decline: 3Q2021 revenues decreased 4% year-over-year (YoY) due to inflation adjustments lagging peso depreciation and lower steam sales. 9M2021 revenues were flat (-1%).
  • Profitability Pressure: Operating income dropped 43% in 3Q2021 and 44% in 9M2021. This was driven by a 26% increase in cost of sales (materials, production costs) and higher administrative expenses.
  • Net Loss in 9M: The company reported a consolidated net loss of Ps. 1.36 billion for 9M2021, compared to a profit of Ps. 8.73 billion in 9M2020. This reversal was primarily due to a Ps. 4.26 billion impairment charge on property, plant, and equipment (Brigadier Lopez and Lujan de Cuyo plants) and reduced foreign exchange gains.
  • Generation Mix: Total energy generation increased 11% in 3Q2021. Thermal generation rose 24% and renewables 40%, offset by a 33% drop in hydro generation due to drought conditions.
  • Debt Reduction: Financial expenses decreased significantly (69% in 3Q, 38% in 9M) due to lower foreign exchange variations and reduced USD-denominated debt balances.

Outlook, Risks, and Unusual Items

  • Terminal 6 Delay Penalty: Commercial operation of Terminal 6 was delayed 53 days due to COVID-19. CAMMESA imposed a USD 4.4 million penalty, which the Company has rejected and is contesting with evidence of extraordinary circumstances.
  • Regulatory Changes: Resolution No. 1037/2021 created an export account to finance infrastructure due to high energy demand in Brazil. A transitory recognition for generating agents is expected for transactions between Sept 2021 and Feb 2022, though specific instructions are pending.
  • Impairment Charges: A significant non-cash impairment of Ps. 4.26 billion was recorded in 9M2021 related to specific plants, heavily impacting net income.
  • Hydro Constraints: Continued drought in the region has negatively impacted hydro generation (Piedra del Águila), reducing water inflow and reservoir levels.
  • Guarantee Release: Corporate guarantees for La Castellana II and La Genoveva II projects were released in September 2021 upon project completion.

Investor Verification Checklist

  • Penalty Resolution: Verify the status of the USD 4.4 million penalty dispute regarding Terminal 6's delayed commercial operation.
  • Impairment Details: Review the specific valuation methodology and future impact of the Ps. 4.26 billion impairment charge on Brigadier Lopez and Lujan de Cuyo plants.
  • Regulatory Compensation: Monitor the publication of future regulatory instructions regarding the transitory recognition for generating agents under Resolution 1037/2021.
  • Hydro Recovery: Assess the timeline for hydro generation recovery given the ongoing drought conditions in the Limay and Collón Curá rivers.
  • Debt Maturity: Analyze the breakdown of the Ps. 29.7 billion consolidated net debt, specifically the current vs. non-current portions, to evaluate liquidity risks.