Turbo Energy, S.A. current report, Q3 FY2026

Business Context and Reporting Period

Turbo Energy, S.A., a foreign private issuer based in Valencia, Spain, filed Form 6-K on September 17, 2026, covering the month of September 2026. The filing reports on the expansion of the Company's commercial and industrial (C&I) energy storage portfolio.

Key Financial Metrics and Project Data

  • Order Value: Approximately €3 million (US$3.48 million) based on an exchange rate of US$1.1604 per euro.
  • Portfolio Size: 15 firm-order projects across Spain and Chile.
  • Capacity: 15.6 MWh of storage capacity and 5.95 MW of power.
  • Project Status: 2 systems operating, 3 under installation, 9 in manufacturing, and 1 in development.
  • Exclusions: These figures exclude the previously announced 366 MWh Pamesa Net Zero deployment under a $53 million contract.

The filing does not provide specific revenue, profit, cash flow, margin, debt, or liquidity figures for the reporting period.

Material Changes and Outlook

The primary material change is the addition of the 15-project portfolio to the Company's C&I footprint. Management expects non-operating projects to progress through delivery, installation, and commissioning between Q4 2026 and H1 2027, subject to customer site readiness and project-specific conditions. The Company highlighted its AI-driven energy management and optimization capabilities as a key differentiator for these projects.

Investor Verification Checklist

  • Verify the status of the 15 projects against the stated timeline (Q4 2026 to H1 2027) for revenue recognition.
  • Confirm the distinction between this €3 million portfolio and the separate $53 million Pamesa contract to avoid double-counting capacity.
  • Assess the impact of customer site readiness on the projected commissioning dates.
  • Review the full press release (Exhibit 99.1) for details on the AI-driven management capabilities and specific customer contracts.