This Current Report on Form 8-K was filed by Fabrinet (incorporated in the Cayman Islands) on May 12, 2011. The filing discloses the entry into a Material Definitive Agreement and the creation of a Direct Financial Obligation with TMB Bank Public Company Limited.

Key Financial Metrics and Obligations

The filing details a new credit facility agreement rather than reporting period-end financial results. Key terms include:

  • Term Loan Facility: Up to Thai Baht 960 million (approximately $30 million).
  • Interest Rate: 5.28% per annum.
  • Hedging Facility: Currency swaps with a notional amount of $30 million.
  • Settlement Limit: Thai Baht 65 million.
  • Repayment Schedule: Quarterly repayments between September 2011 and March 2017.
  • Drawdown Schedule: Commencing June 15, 2011, with full funding by March 15, 2012.

Material Changes and Use of Proceeds

The primary material change is the execution of the Facility Agreement. The proceeds from the term loan are restricted exclusively for the construction of Fabrinet's new facility, referred to as "Pinehurst Building Six," located in Klongluang Patumthanee, Thailand. The filing does not provide comparative financial data (revenue, profit, or cash flow) for the current period versus prior periods.

Guidance, Covenants, and Risks

The agreement includes specific financial and operational covenants:

  • Financial Covenants: Fabrinet must maintain a maximum debt-to-equity ratio and a minimum interest coverage ratio.
  • Operational Covenants: Restrictions on material business changes, granting liens, mergers, asset disposals, and lending to affiliates.
  • Executive Covenant: CEO David Thomas Mitchell must maintain a specified shareholding amount during the facility term.
  • Risks: Events of default include non-payment, covenant violations, cross-defaults, and material adverse events affecting the business, which could trigger acceleration of obligations.

Investor Verification Checklist

  • Verify the construction progress and capital expenditure requirements for the "Pinehurst Building Six" project.
  • Confirm Fabrinet's current debt-to-equity and interest coverage ratios to ensure compliance with new covenants.
  • Review the impact of the $30 million term loan on the company's overall liquidity and leverage profile.