U.S. Energy Corp. — FY 2012 Form 10-K
Entity note: The supplied filing is for U.S. Energy Corp., not BIG SKY INDUSTRIAL INC. It covers the fiscal year ended December 31, 2012; quarterly figures below are for the fourth quarter where indicated.
Business context
U.S. Energy is a non-operator oil and gas exploration and development company, concentrated in the Williston Basin, with additional interests in Texas and Louisiana. It also owns the Mt. Emmons molybdenum project, a minority geothermal investment, and Remington Village, a multifamily property classified as held for sale. Oil and gas accounted for all reported segment revenue.
Financial and operating performance
| Metric | FY 2012 | FY 2011 |
|---|---|---|
| Oil, gas and NGL revenue | $32.5 million | $31.0 million |
| Net loss | $11.2 million; $0.41 per share | $4.8 million; $0.18 per share |
| Cash from operations | $13.1 million | $2.6 million |
| Cash used in investing | $20.9 million | $17.8 million |
| Production | 444,702 BOE; 1,215 BOE/day | 442,360 BOE; 1,212 BOE/day |
| Average realized price | $73.16 per BOE | $69.98 per BOE |
| Oil and gas impairment | $5.2 million | None reported |
| Cash and cash equivalents at year-end | $2.8 million | $12.9 million |
| Working capital at year-end | $12.8 million | $20.7 million |
| Stockholders’ equity at year-end | $116.1 million | $126.8 million |
Oil and gas revenues rose 5.1%, mainly on higher oil volumes; total production was nearly flat. Oil revenue increased $4.4 million, partly offset by a $2.8 million decline in natural gas and NGL revenue. Realized oil and gas prices fell year over year. The company reported a $10.3 million loss from continuing operations and a $1.8 million after-tax loss from discontinued operations. Reported operating loss was $10.3 million, including the oil and gas impairment and a $2.3 million aircraft impairment.
At year-end, proved reserves were 2.91 million BOE, down from 3.20 million BOE. The standardized measure of discounted future net cash flows was $71.0 million, versus $62.2 million in 2011; PV-10 was $76.5 million. These reserve values are estimates, not market valuations.
Debt, liquidity and capital
Working capital was $12.8 million and the current ratio was 1.96:1. The company reported $10.2 million of total debt in its liquidity comparison, including $10.0 million drawn on its reserve-based credit facility. Separately, contractual debt obligations totaled $19.8 million, including the Remington Village note and land debt; the property-backed note was classified with liabilities held for sale. The credit facility had a $30.0 million borrowing base, matured July 30, 2014, and was in covenant compliance at year-end. Total cash and marketable securities less debt was negative $7.2 million.
Operating cash flow increased to $13.1 million. Investing cash use was $20.9 million, including $42.3 million in oil and gas acquisition and development spending, offset partly by $21.5 million of property-sale proceeds. Financing activities used $2.4 million, reflecting $12.5 million of debt repayments and $10.0 million of new facility borrowings.
Material changes, outlook and risks
- Management budgeted $27.1 million for 2013: $7.1 million for Williston Basin drilling and $20.0 million for producing-property acquisitions. It expected capital resources and operating cash flow to fund operations and projects through 2013, while noting that additional capital could be needed for unplanned drilling or acquisitions.
- Management expected production to remain stable or increase as wells were completed and new wells drilled; natural gas and NGL volumes were expected to decline with Gulf Coast well declines. These are forward-looking expectations, not guarantees.
- In March 2013, the company agreed to sell Remington Village for $15.0 million, subject to due diligence and closing conditions. It expected to net about $14.8 million after selling costs and repay the approximately $9.6 million related note. The filing says the sale was anticipated to close May 6, 2013, but provides no assurance it would close. The aircraft and hangar were also sold in 2013 for $1.9 million and $767,000, respectively.
- Commodity prices, Williston Basin takeaway constraints and differentials, drilling and completion costs, reserve estimates, and access to capital are significant risks. A 10% change in realized oil and gas prices would have affected 2012 revenue by approximately $3.3 million. The company recorded a $5.2 million full-cost ceiling-test impairment in 2012.
- Mt. Emmons remains a long-term, speculative development project: no feasibility study had been completed, permits were uncertain, and water-treatment operations cost about $2.0 million in 2012. The mine plan was submitted to the U.S. Forest Service in October 2012; permitting and water-rights matters remained pending, including an appeal concerning prospecting approval.
- Management reported effective disclosure controls and internal control over financial reporting; the auditor issued unqualified opinions on the financial statements and internal controls.
Important facts for investors to verify
- Confirm the correct issuer: the filing is U.S. Energy Corp., despite the request metadata naming BIG SKY INDUSTRIAL INC.
- Check subsequent filings for the completion and final proceeds of the Remington Village sale, repayment of its secured note, and use of asset-sale proceeds.
- Review liquidity and funding against the 2013 capital budget, borrowing-base redeterminations, facility maturity, covenants, and any financing or asset-sale plans.
- Assess reserve revisions, production trends, realized prices and Williston Basin differentials, and the assumptions behind the 2012 ceiling-test impairment.
- Track Mt. Emmons permitting, litigation, water-treatment costs, and any feasibility study or partner financing; historical resource estimates are not established reserves.