IDACORP, Inc. — Form 10-Q Summary
Reporting period: Quarter and nine months ended September 30, 2011. The combined filing covers IDACORP and its principal operating subsidiary, Idaho Power, a regulated electric utility serving southern Idaho and eastern Oregon. Financial figures below are for IDACORP unless otherwise noted; dollars are in millions except per-share amounts.
Financial performance and position
- Third-quarter revenue: $309.6, essentially unchanged from $309.4 a year earlier. Net income attributable to IDACORP was $107.1 versus $67.1; diluted EPS was $2.16 versus $1.39.
- Nine-month revenue: $796.1 versus $804.1. Net income attributable to IDACORP was $157.7 versus $122.4; diluted EPS was $3.19 versus $2.55.
- Operating income: Third-quarter operating income fell to $71.4 from $89.0; nine-month operating income was $155.8 versus $159.6. Calculated operating margin was approximately 23.1% for the quarter (28.8% in 2010) and 19.6% year to date (19.9% in 2010).
- Tax and earnings quality: The third-quarter income tax benefit was $45.4, including recognition of $56.9 of previously unrecognized tax benefits after IRS/JCT approval of a tax accounting method settlement. This nonrecurring item materially boosted reported earnings.
- Cash flow and investment: Nine-month operating cash flow was $234.9, compared with $222.5 in 2010. Capital additions were $267.0, versus $249.4; operating cash flow less capital additions was negative by approximately $32.1. Cash declined to $31.3 at September 30 from $228.7 at year-end 2010.
- Debt and liquidity: Long-term debt was $1,487.5, with $51.5 of commercial paper outstanding. IDACORP’s current liabilities were $254.5 and current assets $309.3. Leverage covenant ratios were 48% for IDACORP and 50% for Idaho Power, below the 65% limit. New revolving credit agreements entered into October 26, 2011 provide $125 of capacity for IDACORP and $300 for Idaho Power; neither had borrowings under its facility at September 30.
- Dividends: $0.30 per share declared in the quarter and $0.90 for the nine months, unchanged from 2010 periods.
Material changes and operating drivers
- Tax settlement benefits lifted earnings, while an $18.1 regulatory liability reduced third-quarter revenue to reflect the sharing with Idaho customers of estimated earnings above the 10.5% return threshold under a prior settlement. The company also reversed $6.8 of additional deferred investment tax credit amortization.
- Favorable water conditions drove hydroelectric generation to 8.683 million MWh year to date, versus 5.887 million in 2010. Management expected full-year hydro generation of 11.0–11.5 million MWh, compared with 7.3 million in 2010.
- Higher hydro generation reduced thermal generation and fuel expense, but purchased power expense rose due largely to increased purchases under PURPA contracts. Lower regional wholesale prices reduced average off-system sale prices by 37% in the quarter and 33% year to date, despite higher sales volumes.
- Operating and maintenance expense increased $12.6 in the quarter and $21.5 year to date, principally from labor, pension, and plant maintenance costs. Idaho Power’s customer growth remained modest: 0.7% for the 12 months ended September 30, versus a 20-year average of 2.7%.
Outlook, regulation, and risks
- Idaho rates: A settlement stipulation, pending IPUC approval, would raise annual Idaho base-rate revenue by $34.0, or 4.07%, effective January 1, 2012. It provides for a 7.86% authorized return and shifts specified PURPA power costs to the Idaho PCA mechanism. Approval and final terms were uncertain at filing.
- Other rate cases: Idaho Power requested a $5.8 annual Oregon revenue increase, with any approved new rates anticipated no earlier than June 1, 2012. It also sought extension of prior Idaho settlement provisions; approval could trigger an additional estimated fourth-quarter 2011 pre-tax customer-sharing charge of about $10.
- 2011 estimates: Management reported no change to estimated Idaho Power O&M expense of $310–$320 and capital expenditures of $320–$330. Estimated hydro generation was revised to 11.0–11.5 million MWh. The company expected total capital expenditures of $770–$800 from 2011 through 2013.
- Projects and funding: The $427 Langley Gulch natural-gas plant was under construction, with $321 incurred through September 30; management expected it to be in service by June 2012 and at or below the commitment estimate. Heavy infrastructure spending means operating cash flow may not fully fund capital needs; the company expects to use internal cash and external financing.
- Material risks and contingencies: Key exposures include regulatory cost recovery, drought and water rights, fuel and wholesale power prices, mandated intermittent generation, environmental compliance, and construction costs. A FERC Pacific Northwest refund proceeding remains unresolved and the possible loss could not be estimated. An EPA notice concerning Boardman also remains unresolved; Idaho Power’s 10% share of any penalty was not estimable. Two wind projects appealed the rejection of 13 power purchase agreements, which had represented about $1.3 billion of expected lifetime payments.
- Unusual items: The Boardman plant is scheduled to cease coal operations by the end of 2020; Idaho Power estimated its share of required emissions-control capital costs at $6.0. Pension funding, hydroelectric relicensing, and transmission projects also entail substantial ongoing cash requirements.
Investor verification priorities
- Separate recurring operating performance from the $56.9 tax benefit and assess the resulting tax rate and EPS quality.
- Check the IPUC’s final decision on the Idaho rate settlement and the proposed extension of earnings-sharing and tax-credit provisions, including any fourth-quarter charge.
- Monitor actual hydro generation, wholesale prices, and PURPA purchase costs against management’s outlook and their effects on cash flow and customer rates.
- Review capital spending, cash balances, commercial-paper use, debt maturities, and access to the renewed credit facilities.
- Track outcomes of the FERC refund matter, Boardman environmental proceedings, wind-contract appeals, water-rights proceedings, and major construction plans.